Title Page
-
Conducted on
-
Prepared by
-
Location
MOD
-
Check the entire building & lot for break in, hiding people, damage etc. Park by front door.
-
Turn off Alarm & Start the Yellow Timer
-
Turn Off the Outside Lights
-
Verify Counts & Products are Rotated. Nothing Expired
-
Complete Par Prep sheet, adjust for miscounts
-
SICOM Morning Routine for terminal Updates, & Sales are 0.
-
Verify Freezer pulls & Rotate Products
-
Check batter # & rotation
-
Check on biscuit person 1/2 pans, 2 biscuits per brush, etc.
-
Turn on Hood System & Fryers
-
Verify oven on & working properly
-
Review closing cleaning checklist.
-
Was closing checklist completed
-
Verify Waste & Discard
-
Review DT Chart
-
Was DT Chart Completed
-
Review HACCP log
-
Was HACCP log completed
-
Verify monies & set up drawers
-
Verify Prep & Seasoning for coding & rotation
-
Finish setting up production line & verify coding
-
Check the outside / lobby / restrooms / windows.
-
Verify fully stocked DT & Front
-
Verify sanitizer buckets / towels out & PPM levels.
-
Complete Food Safety & DM Walk-through checklists
-
Everyone in uniforms, hats, nametags, aprons-sharp
-
IF NOT, whom needed uniform piece(s) & what was given out to them if applicable.
-
Have a "Huddle" Add smiles & open
Batterman
-
Filled sinks leaving one open for rinsing cabbage.
-
Check Sanitizer for 200 PPM. Notify Manager if it is off.
-
Ask MOD how many batters should be made.
-
Rotate buckets already in cooler. Check tags for freshness.
-
Prepare new batters, tag & rotate into cooler
-
Insure All batter station equipment is in the batter / fryer areas.
-
Set up the "Ice Bath" per policy
-
Make Freezer Pull by following Par-Prep Sheet
-
Make the trash run & clean the parking lot
-
Sweep out the dumpster area & corners of the lot.
-
Pick up Litter in Landscape Areas
-
Get the window cleaning equipment & paper towels
-
Wipe down rear menu boards & toppers
-
Wipe down window ledges as windows are cleaned. No Dust
-
Clean Drive-Thru Window Ledge
-
Clean door thresholds
-
Finish setting up batter station. Apron clean?
-
Make 1st SMALL drops every 15-20 minutes
-
Place 1st pan in oven … 1/2 pan
PREP
-
Washing Hands - Focused on Food Safety
-
Turn on CHUB Warmer check for 180 F
-
Turn on & set up the CVAP add 2 gallons of water.
-
Turn on Steam Table & verify temp 160 to 170 F
-
Set out a sanitizer bucket in prep area
-
Consult MOD for prep requirements
-
Finish rinsing slaw & set up rinse sink
-
Start preparing the Red & Cajun Rice.
-
Place CHUBS in warmer based on PARPREP Sheet.
-
Prepare Cole Slaw, let it settle before cupping.
-
Place & dress biscuit, If there is no Biscuit person.
-
Finish prepping Red & Cajun Rice
-
Turn on oven, if not already on.
-
Heat products for steam table & CVAP - must be 165F and code dated.
-
Verify proper water level in steam tables
-
Prepare Mashed Potatoes
-
Set up Sandwich station
-
Start making Tea
-
Finish washing utensils & equipment
-
Clean & Sanitize all counters
-
Sweep & Mop Floors
Seasoner
-
Set up the biscuit station including paper towels
-
Throw away any old biscuits from last night
-
Give total number thrown away to MOD
-
Dry & Dress pans with Biscuit Dressing
-
Start panning biscuits, Make 6 half pans to open with, then make the rest full pans. Follow ParPrep.
-
Turn on one oven, ensure it works properly.
-
Make the freezer pull by using the PARPREP Sheet
-
Make the trash run
-
Wash trash cans and re-line them
-
Clean back door inside and outside
-
Sweep and mop back kitchen & back door area.
-
Insert tenders, tag and rotate / LTO.
-
Set up Seasoning Area & Remove ONE case at a time to season.
Cashier
-
Finish making tea & fill bags. Code & Rotate
-
Check Ice Levels @ Drink Stations
-
Check stock levels @ DT & Front Counter
-
Inspect Lobby, & Restrooms for cleanliness & Stocked