Title Page
-
Site
-
Conducted on
-
Prepared by
-
Painter name
-
Location
Inspection
-
1 sealer coat to walls?
-
2 colour coats to walls?
-
Walls sanded between coats?
-
2 coats to ceiling / back rolled?
-
Are ceiling lines visible?
-
Timberwork completed including stairs?
-
Doors completed and re-hung correctly?
-
Hardware installed / hinge pins knocked down?
-
External paint complete?
-
Windor archs fully gap filled including tops & bottoms?
-
External doors painted?
-
Tops & bottoms of doors also done?
-
All paint work at Display Home Standard or above?
-
Doors tipped off?
-
No nails visible at window/door reveals?
-
Under staircase to be sealed ( treads, risers, stringers and back of raking wall)
-
Excessive paint / tape removed from windows & doors?
-
Excess paint / tape removed from cabinetry?
-
All tape and plastic removed from all other areas?
-
Timber windows screwed back in place?
-
All door rubbers re-installed?
-
Is there excessive paint on the garage slab?
-
Paint on external door hinges?
-
All rubbish removed and placed in bins?
-
Job swept out and left tidy?
-
Electrical and heating/cooling fit off complete?
-
Date they are booked for?
-
Date ready for tiler?
-
Any other concerns?
-
Photo of paint order docket. Confirm it matches PO & colour document
SIGNATURES
-
Site Supervisor