Title Page

  • Site conducted

  • Location
  • Type in your address below as backup at all times

  • Address

  • Take Photo of Front LetterBox including overview of house.

  • Conducted on

  • Prepared by

Patio 1

  • DEFINITION: P1 is the main or largest patio and can be located Front, Back, LHS or RHS

Validate P1 Patio Information

  • Where is P1 located?

  • Confirm patio type

  • Confirm number of columns is the same as the data provided

  • Confirm size of tek screws is as per the data provided

Patio 2

  • DEFINITION: P2 is the main or largest patio and can be located Front, Back, LHS or RHS

Validate P2 Patio Information

  • Where is P2 located?

  • Confirm number of columns is the same as the data provided

  • Confirm patio type

  • Confirm size of tek screws is as per the data provided

Variations

Variations

  • Is there any infrastructure that will interfere with the patio works?

  • What is the impediment?

  • If other describe details.

Builders Ingoing Assessment

  • This page is for the builder to document whatever they require to assist with on the job management.

  • Take photos of external area and make notes as required

  • Take photos of eave lining area adjacent to the worksite prior to commencing

Builders Handover and ITP

  • Builder must answer all questions and take clear photos showing outcome achieved.

Patio Column Replacement

  • Excavation of each column to confirm condition

  • Is mesh evident in concrete slab

  • Footing pre-pour [all columns]

  • Finished hardstand

Patio Strengthening

  • PLB to Fascia Brackets

  • Column to PLB Brackets

  • External PLB to Front Beam plate

  • Internal Central Beam to PLB connections

  • Additional beam fixings

  • Overall patio

  • Any other relevent photos

Variations - take photos and add description

  • Variation 1

  • Variation 2

  • Variation 3

  • Variation 4

Builder Completion

  • Take photos of external area to confirm no damage on completion.

  • Take photos of eave lining area adjacent to works to confirm no damage on completion

  • Record Date and Time of ITP inspection completed.

  • Full Name of Person Completing ITP Inspection

WEL Representitive Review

  • Is Practical completion achieved? Record Actions

  • Record date and time of review completed

  • Name of WEL Representive who has reviewed and completed.

  • PC certificate Issued and actions registered

  • Has Final Completion been achieved. All actions completed, evidence provided.

  • If final Completion not achieved. Issue notice via CLMS.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.