Title Page
-
Site conducted
-
Location
-
Type in your address below as backup at all times
-
Address
-
Take Photo of Front LetterBox including overview of house.
-
Conducted on
-
Prepared by
Pergola 1 - Inspection
-
DEFINITION: Pergola 1 is the largest and can be located Front, Back, LHS or RHS
Validate Pergola 1 Information
-
Where is Pergola 1 located?
-
Condition of Fascia Beam. Take photos.
-
Condition of rafter to Fascia Beam connection. Take photos left to right [facing the house] of each connection.
-
How many rafters require works?
-
Is the pergola attached to the front carport with a edge beam?
-
Condition of edge beam. Take Photos
-
Does the pergola have any columns? Take photos left to right facing the house.
-
What is the hardstand made from?
-
Are there any installations on the pergola?
-
What is the installation? Take photos
- Lighting Permanent
- Lighting Temporary
- GPO
- Fan
- Camera
- Conduit
- Retic
- Shade Sails
-
Recommend a Scope of Works
- Pergola Condition 1 - Unsafe Remove
- Pergola Condition 2 - Undertake repair works
- Pergola Condition 3 - Put onto a maintenance plan
-
Fascia plate
- replace
- re-secure
-
Carport or outer beam
-
Rafters
- replace
- re-secure
-
columns
- replace column
- replace column and footing
-
Is there any roof top infrastructure that will interfere with future new patio works?
- Solar HWS
- Solar Power
- Satellite Dish
- Flu
- Vent
- Shade Sail
- other
- Old Solar plumbing
-
Site Plan - measure all set backs to fence line for pergolas. [mark up on site plan provided and take a photo]
WEL Scope Approval
Scope of Work Approval - Works are approved as per the tender description by the WEL representative.
-
If site conditions vary from scope, contractor to advise WEL Rep to confirm scope changes.
-
Scope details.
-
SOW Approved
-
Signature