Title Page
-
Conducted on
-
Prepared by
-
Location
Homeowner/Tenant Details
Name
Address
Telephone No
-
UNSAFE SITUATIONS: ID Yes/No AR Yes/No RIDDOR
-
If Yes, Name person at HO informed by phone:
-
Loft Insulation - POST INSPECTION
-
Ref No:
-
Installer
-
Installation Date
-
Final Inspection Date
-
QAA Date:
-
QAA Inspectors Name
System Installation
-
Does the percentage of the measure installed match the specification?
-
Is there any evidence to suggest any pre-existing loft insulation?
-
Is the thickness of insulation consistent throughout the floor area?
-
Has insulation been close butted?
-
Has insulation been cross laid to prevent cold bridging?
-
Has the loft hatch been insulated as specified in PAS2030?
-
Is a signed and completed loft insulation declaration present in the loft?
-
Where down lights or services have been fitted through the existing ceiling, have any measures been taken to prevent air leakage around down lights in to roof void?
-
Is the loft space adequately insulated?
-
Have any and all working pipes been insulated properly?
-
Are electric cables safeguarded as specified in PAS2030?
-
Are down lights safeguarded as specified in PAS2030?
-
Are other electrical apparatus penetrating the ceiling safeguarded as specified in PAS2030?
-
Is there clearance between the flues and chimneys safeguarded as specified in PAS2030?
-
Has insulation been installed to all working tanks? (Including under cold water storage tank)
-
Has insulation been installed to all working pipes?
-
Have all essential ventilation openings been safeguarded in accordance with PAS2030?
-
Is a walk board fitted in accordance with PAS2030
-
Are warning signs fitted in accordance with PAS2030?
-
Is the insulation > 300mm clear from the air intake of vertex type flues?
-
Has all access equipment i.e. ladders been removed from site?
-
Are there any other health and safety issues related to the installation?
Fire Detection to meet requirements of BS5839- Grade F: Cat LD2
-
Lounge & Kitchen ( Heat Detection )
-
Upper & Lower Hall forming escape routes (smoke detection)
-
Carbon Monoxide/Dioxide Alarm installed to manufacturers instructions?
Customer Documents
-
System documentation & LI installation completion certificate/s left with documents?
Customer Care
-
Contact & Punctuality of Surveyors/Installers/Inspectors
-
Polite & Professional team -Surveyors/Installers/Inspectors
-
Care of customer property/damages (has the customer advised WW)
-
Is the customer competent on using the system controls
-
Does the customer know what to do in case of an emergency
-
Did the customer receive advise on fuel tariff's
-
Contact details left for Warmwork's
-
Assistance moving furniture and lifting carpets (where specified)
-
Have all redundant materials been removed
-
Installation neat and tidy
SCHEME COMPLIANCE
-
Are all Measures Installed as expected
-
Overall Impression based on all categories and appearance in public spaces
-
Inspection Feedback/comments/concerns if any:
SIGNATURES
-
Does the customer have any complaint issues?
-
Complaint details
-
Customer signature Print name
-
QAA Inspectors Signature Print name