Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PICOP details
-
Name
-
Job title
-
Employer
-
Location of inspection
Possession details
-
WON area and WON week number
-
Item number
-
PPS reference
-
Possession manager
-
Location
Competence
-
Is the (S)PICOP in possession of their SENTINEL Card
-
Is the SENTINEL Card valid?
Paperwork and PPE
-
Has possession been published in WON or late notice
-
Is the (S)PICOP in receipt of the possession pack
-
Is the record of arrangement form (RT3198) completed by the (S)PICOP
-
Is the (S)PICOP wearing or has available the correct armband
-
Is the (S)PICOP wearing or has available clean and maintained Hi-Vis clothing
Observations
-
Has the (S)PICOP any other responsibilities; If yes what? Is this in accordance with NR/L3/MTC/PL175/14
-
Can the (S)PICOP demonstrate knowledge of lines/locations of possession
-
For hand over of Possession between (S)PICOP, has a thorough handover been completed
-
Is the protection set up correctly for converging lines
-
Have all Train/OTM/OTP propelling movements been pre-planned and authorised
-
Has the (S)PICOP given the ES authority to start work?
-
Does the (S)PICOP record train movements in and out of the possession
-
Has the (S)PICOP withdrawn the protection arrangements correctly?
-
Is the person in charge of sidings identified and recorded?
Communications
-
Does the (S)PICOP have the means to communicate with the ES, signalman, ECO, PSS etc?<br>
-
Are conversations held by the (S)PICOP, clear, concise and using the phonetic alphabet?
-
Are messages repeated back?
-
Is the (S)PICOP aware of the affected signal boxes and in receipt of the correct telephone numbers
The following are applicable for DC lines
-
Are the isolation electrical sections within the protection limits?
-
Are hook switches being used? If so H/S number and position (Open or closed). As per B2
The following are applicable for AC lines
-
Are the isolation electrical sections within the protection limits? If no is Rimini in place for the access.
-
Has the ES/COSS got a permit to work?