Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Information
-
A weekly plant inspection of the Pipework is to be carried out by the site supervisor/ Manager (Yes = Checked OK, No = Fault) All critical/ Urgent issues must be reported immediately to the project manager. Add notes and photos to each section where there are issues found
Refrigeration Systems
-
Anchor/fixing size(s) correct<br><br>
-
-
-
Support type and size correct <br><br>
-
-
-
Support spacing correct<br>
-
-
-
Pipework routing as per drawing<br><br><br>
-
-
-
Pipework size correct<br><br><br><br>
-
-
-
Pipework materials correct<br><br><br><br>
-
-
-
Pipework joints sound<br><br>
-
-
-
Pipework welds sound<br><br><br><br>
-
-
-
Welds stamped<br>
-
-
-
Pipework expansion accounted for<br><br>
-
-
-
Provision of venting pipework<br><br><br><br>
-
-
-
Provision of draining pipework<br><br><br><br>
-
-
-
Pipework painting complete<br><br><br><br>
-
-
-
Pipework sleeves fitted<br><br><br>
-
-
-
Pipework sleeves fire stopping fitted<br><br><br>
-
-
-
Isolating valves installed as per drawing<br><br><br>
-
-
-
Commissioning valves installed as per drawing and specification<br><br>
-
-
-
Strainers fitted where required<br><br>
-
-
-
Equipment flexible connections sound<br>
-
-
-
Flexible connections installed as per drawings<br><br>
-
-
-
Fan coil unit connections as per specification and drawings<br><br>
-
-
-
Insulation neat and tidy<br><br>
-
-
-
Any further comments
-
Site Managers Signature