Title Page
-
Site impacted by change
-
Change Title
-
Originated on
-
CoC Owner
-
Originator
-
Change reference number
-
Please select type of change request
-
Reason change is an Emergency.
-
Date that Temporary change will no longer be required.
Part 1- Change Proposal
This section to be completed by originator
-
Date required
-
Plant zone
-
Description- please attached photos, sketches, marked-up drawings by clicking "Media" below this question
-
Additional information
Part 2- Approval in Principle
This section to be completed by Change Reviewer Committee
-
Priority Driven by:
- Standard Priority
- Environmental Priority
- Safety Priority
- Operability Priority
- Financial Priority
-
Job Summary:
-
Change Request Form Approved or Refused
-
Reason for refusal
Scale of Change
-
Will this change impact ATEX/DSEAR Assessments?
-
Will this change impact Pressure Systems (PSSR/PED)
-
Will this change impact the Environmental Permit?
-
Will this change require CDM?
-
Will this change require a new HAZOP and/or LOPA?
-
Will this change impact, or potentially require new, Safety Instrumented Functions (SIFs)
-
Will this change alter the Basis of Safety or impact the assumptions in the plant ALARP?
-
If the answer to one or more of the above questions is Yes, then this constitutes a MAJOR change
-
Scale of Change- Approval
-
Operations Director Approval:
-
Engineering Director, Board Director or
-
HOPO/HOPE Approval:
-
Process Engineering Manager Approval:
Part 3 Impact Action Checklist- This section to be completed by CoC Owner
Site Safety Impact
-
Will the Fire Risk Assessment need to be reviewed?
-
Will the existing HAZOP/LOPA need to be reviewed?
-
Will the change be subject to PUWER?
-
Will this change effect Access to plant or equipment?
-
Will the change be subject to LOLER?
-
Do site safety Signs need to be updated as a result of this change?
WHICH OF THE FOLLOWING PLANT DOCUMENTATION IS IMPACTED BY THIS CHANGE?
-
PFD/P&ID
-
Which PFDs/P&IDs will be effected? Please list and raise a DCR for the affected drawings.
-
Enter relevant DCR Number here
-
Electrical Drawings
-
Which Electrical Drawings will be effected? Please list and raise a DCR for the affected drawings.
-
Enter relevant DCR Number here
-
Drawings
-
Which drawings will be effected? Please list and raise a DCR for the affected drawings.
-
Enter relevant DCR Number here
-
DSEAR Zone
-
Risk Assessments
-
Which Risk Assessments will be effected? Please List
-
Safe Working Procedures
-
Which Safe Working Procedures will be effected? Please List.
-
CoSHH Assessments
-
Which CoSHH Assessments will be effected by this change? Please List.
-
O&M Manuals in CMMS
Environmental Impact
-
ISCC
-
Emissions
-
Noise
Regulatory Considerations
-
Other
Process Condition Change
-
Changes to T, P, Flow, Level etc.
-
New Materials
Personnel
-
PPE
-
Training
Engineering & Design
-
Civils
-
Equipment Testing
-
Planned Maintenance
-
Control System & Instrumentation
-
Earthing
-
Does this change involve the creation of new Assets?
-
Which Asset Tag No.s have been created for this change? Please list below.
-
Have Asset Tags been ordered/printed?
-
Plant Labelling (tags etc.)
-
Interlocks
Operating Procedure Changes
-
New/Updated Procedure required
-
Commissioning plan required
-
Temporary Work Instruction required
-
New/Updated Risk Assessment Required
Other
-
Other
Part 4 - Approval for Implementation
-
Are change impacts correctly documented and actions raised to address? Have those actions been sufficiently progressed to allow implementation?
-
Scale of change
-
Operations Director- Approval for Implementation
-
Engineering Director- Approval for Implementation
-
Enter Work Order Number raised.
-
HOPO/HOPE- Approval for Implementation
-
Process Engineering Manager- Approval for Implementation
-
Enter Work Order Number raised.
Part 5 - Pre-Start Up Safety Review- to be completed after change has been made but before it is used
-
Have all actions been completed?
-
Are any open actions intrinsic to the safe use of the modification?
-
This CoC Cannot be signed off for use. THE MODIFICATION CANNOT BE USED
Physical Checks
-
Have all plant Isolations been removed?
-
Have all drain/vent valves been closed?
-
Have all isolation valves been opened?
-
Has motor direction been confirmed?
-
Has the system been pressure/vacuum tested?
-
Has scaffolding been removed if no longer required?
-
Have all fixed and removeable guards been refitted?
Plant Documentation
-
Have all drawing changes been completed & uploaded to IMS ?
-
Have required procedure changes been made and revised procedures issued?
-
Has any new or changed asset details been updated in the CMMS?
-
Are all relevent staff aware of the modification and its purpose?
-
Have all HAZOP/LOPA actions been acceptably closed?
-
Have all required changes to the DCS/HEMA been made and tested?
-
Have relevent Preventative Maintenance activities been updated in the CMMS?
Systems
-
Have all required assets been created and detailed correctly in the CMMS?
-
Have Asset Tags been issued and correctly applied to the assets in the field?
Other
-
Has all installation debris & tools been removed?
-
Has training been delivered and training records updated?
-
Have Operations check sheet/log templates been updated?
-
Has a "Heads-Up" been raised to communicate the new system/procedures etc to Operations & Maintenance?
Part 6 - Approval for Use
-
Is Modification safe/ready to use?
-
Scale of Change- Completion
-
HOPO Acceptance:
-
Operations Director Approval:
-
Engineering Director Approval
-
HOPO/HOPE Approval:
-
Process Engineering Manager Approval:
Part 7 - Temporary Change Reversion
- Change Review
-
Date of Review
-
Is this change still required?
-
Review the actions that were required in Part 3 - Impact Action Checklist to implement the change and create new actions to reverse those changes in each relevant section.
-
Have all reversion actions been suitably completed?
-
Change Reviewers to complete Part 8 - Completion/Closure
-
Should this be converted to a Permanent change?
-
Date of next review (Can be no greater than 3 months from the date of this review)
-
Are additional actions required to convert this change to Permanent?
-
Have all actions associated with this Change been completed?
-
Change Reviewers to complete Part 8.
Part 8 - Completion/Closure
-
Are all actions associated with this change complete?
-
Is the changed equipment, plant or process functioning correctly without issue? (N/A if this is a Temporary change that has been reversed.)
-
If the answer to all of the above is Yes or N/A, then the CoC can be closed. To Close the CoC click "Complete Inspection" below.