Title Page

  • Site impacted by change

  • Change Title

  • Originated on

  • CoC Owner

  • Originator

  • Change reference number

  • Please select type of change request

  • Reason change is an Emergency.

  • Date that Temporary change will no longer be required.

Part 1- Change Proposal

This section to be completed by originator

  • Date required

  • Plant zone

  • Description- please attached photos, sketches, marked-up drawings by clicking "Media" below this question

  • Additional information

Part 2- Approval in Principle

This section to be completed by Change Reviewer Committee

  • Priority Driven by:

  • Job Summary:

  • Change Request Form Approved or Refused

  • Reason for refusal

Scale of Change

  • Will this change impact ATEX/DSEAR Assessments?

  • Will this change impact Pressure Systems (PSSR/PED)

  • Will this change impact the Environmental Permit?

  • Will this change require CDM?

  • Will this change require a new HAZOP and/or LOPA?

  • Will this change impact, or potentially require new, Safety Instrumented Functions (SIFs)

  • Will this change alter the Basis of Safety or impact the assumptions in the plant ALARP?

  • If the answer to one or more of the above questions is Yes, then this constitutes a MAJOR change

  • Scale of Change- Approval

  • Operations Director Approval:

  • Engineering Director, Board Director or

  • HOPO/HOPE Approval:

  • Process Engineering Manager Approval:

Part 3 Impact Action Checklist- This section to be completed by CoC Owner

Site Safety Impact

  • Will the Fire Risk Assessment need to be reviewed?

  • Will the existing HAZOP/LOPA need to be reviewed?

  • Will the change be subject to PUWER?

  • Will this change effect Access to plant or equipment?

  • Will the change be subject to LOLER?

  • Do site safety Signs need to be updated as a result of this change?

WHICH OF THE FOLLOWING PLANT DOCUMENTATION IS IMPACTED BY THIS CHANGE?

  • PFD/P&ID

  • Which PFDs/P&IDs will be effected? Please list and raise a DCR for the affected drawings.

  • Enter relevant DCR Number here

  • Electrical Drawings

  • Which Electrical Drawings will be effected? Please list and raise a DCR for the affected drawings.

  • Enter relevant DCR Number here

  • Drawings

  • Which drawings will be effected? Please list and raise a DCR for the affected drawings.

  • Enter relevant DCR Number here

  • DSEAR Zone

  • Risk Assessments

  • Which Risk Assessments will be effected? Please List

  • Safe Working Procedures

  • Which Safe Working Procedures will be effected? Please List.

  • CoSHH Assessments

  • Which CoSHH Assessments will be effected by this change? Please List.

  • O&M Manuals in CMMS

Environmental Impact

  • ISCC

  • Emissions

  • Noise

Regulatory Considerations

  • Other

Process Condition Change

  • Changes to T, P, Flow, Level etc.

  • New Materials

Personnel

  • PPE

  • Training

Engineering & Design

  • Civils

  • Equipment Testing

  • Planned Maintenance

  • Control System & Instrumentation

  • Earthing

  • Does this change involve the creation of new Assets?

  • Which Asset Tag No.s have been created for this change? Please list below.

  • Have Asset Tags been ordered/printed?

  • Plant Labelling (tags etc.)

  • Interlocks

Operating Procedure Changes

  • New/Updated Procedure required

  • Commissioning plan required

  • Temporary Work Instruction required

  • New/Updated Risk Assessment Required

Other

  • Other

Part 4 - Approval for Implementation

  • Are change impacts correctly documented and actions raised to address? Have those actions been sufficiently progressed to allow implementation?

  • Scale of change

  • Operations Director- Approval for Implementation

  • Engineering Director- Approval for Implementation

  • Enter Work Order Number raised.

  • HOPO/HOPE- Approval for Implementation

  • Process Engineering Manager- Approval for Implementation

  • Enter Work Order Number raised.

Part 5 - Pre-Start Up Safety Review- to be completed after change has been made but before it is used

  • Have all actions been completed?

  • Are any open actions intrinsic to the safe use of the modification?

  • This CoC Cannot be signed off for use. THE MODIFICATION CANNOT BE USED

Physical Checks

  • Have all plant Isolations been removed?

  • Have all drain/vent valves been closed?

  • Have all isolation valves been opened?

  • Has motor direction been confirmed?

  • Has the system been pressure/vacuum tested?

  • Has scaffolding been removed if no longer required?

  • Have all fixed and removeable guards been refitted?

Plant Documentation

  • Have all drawing changes been completed & uploaded to IMS ?

  • Have required procedure changes been made and revised procedures issued?

  • Has any new or changed asset details been updated in the CMMS?

  • Are all relevent staff aware of the modification and its purpose?

  • Have all HAZOP/LOPA actions been acceptably closed?

  • Have all required changes to the DCS/HEMA been made and tested?

  • Have relevent Preventative Maintenance activities been updated in the CMMS?

Systems

  • Have all required assets been created and detailed correctly in the CMMS?

  • Have Asset Tags been issued and correctly applied to the assets in the field?

Other

  • Has all installation debris & tools been removed?

  • Has training been delivered and training records updated?

  • Have Operations check sheet/log templates been updated?

  • Has a "Heads-Up" been raised to communicate the new system/procedures etc to Operations & Maintenance?

Part 6 - Approval for Use

  • Is Modification safe/ready to use?

  • Scale of Change- Completion

  • HOPO Acceptance:

  • Operations Director Approval:

  • Engineering Director Approval

  • HOPO/HOPE Approval:

  • Process Engineering Manager Approval:

Part 7 - Temporary Change Reversion

    Change Review
  • Date of Review

  • Is this change still required?

  • Review the actions that were required in Part 3 - Impact Action Checklist to implement the change and create new actions to reverse those changes in each relevant section.

  • Have all reversion actions been suitably completed?

  • Change Reviewers to complete Part 8 - Completion/Closure

  • Should this be converted to a Permanent change?

  • Date of next review (Can be no greater than 3 months from the date of this review)

  • Are additional actions required to convert this change to Permanent?

  • Have all actions associated with this Change been completed?

  • Change Reviewers to complete Part 8.

Part 8 - Completion/Closure

  • Are all actions associated with this change complete?

  • Is the changed equipment, plant or process functioning correctly without issue? (N/A if this is a Temporary change that has been reversed.)

  • If the answer to all of the above is Yes or N/A, then the CoC can be closed. To Close the CoC click "Complete Inspection" below.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.