Title Page

  • Site location:

  • PM Numbers covered in this report

  • Client

  • Conducted on:

  • Report prepared by:

  • Gas Safe Licence No.

  • Are you wearing your personal CO alarm and have confirmed operation?

  • DO NOT ENTER THE PLANT ROOM WITHOUT A CO ALARM

  • Please take a photo of BMS panel switch positions before commencing any work

CDM

  • Have you been shown the site asbestos register?

  • Is there a toilet available on site?

  • Is there anything site has made you aware of?

  • Please state

  • Risk of falls from height

  • Risk of collapse of excavations

  • Risk of collapse of structures

  • Risk of exposure to building dust

  • Risk of exposure to asbestos

  • Supervision required

  • Electrical works

  • Are you following safe electrical procedures?

  • Risk to others?

  • Other dangers?

  • Please state

Gas Installation

  • PM Number

  • Meter/ Emergency Control Valve accessible?

  • Fuel type

  • Gas Tightness Test satisfactory

  • Pipework installed, identified correctly and in satisfactory condition?

  • What is the issue

  • Please take a photo of the pipework/fault

  • Is the installation safe to use?

  • Gas Solenoid Valve
  • PM Number

  • Photo of solenoid

  • Gas solenoid visual and functional check

  • What is the issue?

  • Gas Appliance
  • PM Number

  • Location

  • Engineer

  • Type of work done

  • Fuel type

  • Description ( i.e. Boiler 1)

  • Owner

  • Type of appliance

  • Make, model and kW rating

  • Flue type

  • Low level ventilation requirement- cm2 ( gross if more than one unit )

  • Low level ventilation measurement- cm2

  • High level ventilation requirement- cm2 ( gross if more than one unit )

  • High level ventilation measurement- cm2

  • Ventilation Satisfactory

  • Safety controls working?

  • Flue visual check

  • Flue termination satisfactory?

  • Flue flow satisfactory?

  • Spillage test satisfactory?

  • Appliance safe to use?

  • Reason appliance is not safe to use

  • Warning notice issued

  • Copy of combustion analysis

  • Details of remedial works required

  • Photo of appliance

  • Data plate photo

  • Integral pump?

  • Engineers Signature

  • Flues
  • PM Number

  • Flue Description

  • Photo of flue

  • Visual check

  • Functional check (flow and spillage tests)

  • Pump
  • PM Number

  • Description ( i.e. VT pump 2 )

  • Make and model

  • Photo of pump

  • Data plate photo

  • Visual check

  • What is the issue?

  • Functional check

  • What is the issue?

  • Motor current reading (amps)

  • Cylinders/Water Heater
  • PM Number

  • Type of unit ( i.e DHW cylinder/water heater or solar preheat )

  • Make and model

  • Photo of unit

  • Data plate photo

  • Capacity ( litres )

  • Cylinder/Water Heater photos

  • Cylinder/Water Heater data plate photo

  • Description ( i.e. Cylinder 1 or Kitchen cylinder/water heater)

  • Indirect, Direct or Point of Use?

  • Safety valve(s) operation checked? ( if applicable )

  • Did the valve(s) re-seat properly or is it/are they passing?

  • Please take a photo of the valve that is passing

  • Visual check of unit and ancillary equipment

  • What is the issue?

  • Expansion Vessel
  • PM Number

  • Description ( i.e. Heating vessel or DHW vessel 1 )

  • Expansion vessel photos

  • Capacity ( litres )

  • Visual check

  • What is the issue?

  • Pre-charge pressure checked?

  • Pre-charge pressure (bar)

  • Reason for not checking

  • Has vessel been re-charged with Nitrogen?

  • Pressurisation Unit
  • PM Number

  • Photo of unit

  • Pressurisation Unit functional check

  • What is the issue?

  • Quick fill loop functional check

  • What is the issue?

Boosted Cold Water Pump

  • PM Number

  • Photo of pump

  • Data plate photo

  • Boosted cold water pump visual/fuctional check

  • What is the issue?

  • Condensate Pump
  • PM Number

  • Photo of condensate pump

  • Condensate pump visual/functional check

  • What is the issue?

  • Chemical Dosing Check
  • PM Number

  • PH reading of system water

  • Is the PH value between 8 and 9.5?

  • System water sample taken

  • Why not?

  • Magnetic Filter Check
  • PM Number

  • Photo of filter

  • Filter dismantled and cleaned?

  • New filter elements fitted if applicable?

DHW Solar Assistance

  • PM Number

  • Does the DHW system have solar/thermal assistance?

  • Is a separate Solar/Thermal Report complete?

  • Why not?

  • Photos of ancillary equipment

  • Air Source Heat Pump
  • PM Number

  • Photo of unit

  • Visual check of unit

  • What is the issue?

  • Functional check of unit

  • What is the issue?

  • UFH Manifold
  • PM Number

  • Photo of manifold

  • Functional check of manifold

  • What is the issue

  • Visual check of manifold

  • What is the issue?

Completion

  • Have all BMS panel switches been put back to auto?

  • Is a controls engineer required?

  • Please take a photo to confirm BMS panel switch positions on completion

  • Site responsible person to confirm completion

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.