Prior to Rough-in
-
Latest plans on jobsite (note revision #)
-
Has sewer and rough in layout been checked against architectural drawings and hydraulic drawings?
-
Water Test (needs to be turned off)
-
Does Waste Size Piping meet relevant standards and hydraulic engineer's specification?
-
Do materials meet relevant standards and hydraulic engineer's specification?
Rough-In Checklist
-
Water Test (needs to be turned off)
-
Does plumbing work meet minimum slope requirements?
-
Do all pipes,fittings and jointing methods meet relevant standards or hydraulic engineers specifications?
-
Have all clips, saddles, hangers been placed at correct intervals as per relevant standards, hydraulic engineers or manufacturers specification?
-
Have all inspection openings, expansion joints been placed at correct intervals? <br>
-
Have all waste points, lugged elbows, mixers,in wall cisterns and support noggins been placed at correct heights and depths?
-
Have all cold,hot,hot return, rainwater lines, hot water locations and solar panel locations been ran as per hydraulic engineers drawings?
-
Have all vents been brought through ceiling or roof?
-
Have all leak control flanges been installed?
-
Have all pipes been lagged according to relevant standards or hydraulic engineers specifications?
-
Have all pipes penetrating through fire rated walls, had fire collars or fire caulking placed around them?
-
Have all water lines and sewer drain been tested?
Testing and Final Check
Are the items installed correctly? (Please tick where rectification is required)
Pressure reducing valve
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Fittings
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
PC Items
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Hot water system
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
T/P Toilets
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Backflow requirements
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Mixers/taps
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Basins/sinks/bottle traps/plug and wastes
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Sewage/Drains/Flush
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Stormwater Pits
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Downpipes
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
IO Covers installed
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
Meter connection
-
Correctly installed
-
Correct Item
-
Correct location
-
Working
-
Pressure test