Title Page

  • Customer Name

  • Postcode

  • Conducted on

  • Prepared by

  • Location

Scaffolding Health & Saftety

  • Have you visually inspected the scaff and are you happy they are no visible issues

  • Valid tag showing name and contact details

  • Are they any issues with scaffold (gate on wrong side, etc)

  • Take photos of any issues

Roof Works

Photo's Pre-Installation of Target roof one

  • Is their any kit missing or have you been sent something wrong?

  • Is there felt on the roof

  • Is the felt in good condition

  • Take photo(s) of felt where in poor condition

  • Are there signs of existing water ingress ?

  • Photo(s) of area where existing water ingress exists

  • Are there any existing damages on the roof PRE-work commencing

  • Photo with tape measure of the width of the roof tile

  • Photo with tape measure of the EXPOSED height of the roof tile

Roof logic>1 roof

  • Are all the panels going on one roof

  • Are the panels going across 2 roofs

  • Are the panels going across 3 roofs

Additional Target roof questions

  • How many panels are going on roof 2

  • Photo(s) of target roof two from different angles - PRE-INSTALLATION

  • Is there any EXISTING damage on target roof two - PRE work commencing

If different building

  • Is target roof 2 a different building then target roof one

  • Photo with tape measure of the width of the roof tile on target roof two

  • Measured width of roof tile (mm) on target roof two

  • Photo with tape measure of the EXPOSED height of the roof tile on target roof two

  • Measured EXPOSED height of roof tile (mm) on target roof two

  • Photo(s) of the loft of target roof 2

Additional Target roof questions

  • How many panels are going on roof 2

  • Photo(s) of target roof two from different angles - PRE-INSTALLATION

  • Is there any EXISTING damage on target roof two - PRE work commencing

If different building

  • Is target roof 2 a different building then target roof one

  • Photo with tape measure of the width of the roof tile on target roof two

  • Measured width of roof tile (mm) on target roof two

  • Photo with tape measure of the EXPOSED height of the roof tile on target roof two

  • Measured EXPOSED height of roof tile (mm) on target roof two

  • Photo(s) of the loft of target roof 2

Photos DURING Installation target roof one

  • Photo of Roofing Hook secured to rafters with 2 MCS standard roofing screws on multiple hooks

  • Photo(s) of target roof one - HOOKED AND RAILED

  • Is DC cable going through the loft

  • Take picture of DC entry point

  • Photo(s) showing how DC connectors behind the panel are neatly secured with zip-ties on rail

  • Have any tiles been notched

Photos Post-Installation

  • Photo(s) showing panel array and edge of roof(s)

  • Photo(s) showing rail overhang of at least 50mm and a maximum of 200mm

  • Does the job have bird netting?

  • Close up photo(s) of bird netting around solar array(s) uses adequate clips with reasonable spacing, taken from scaffold

  • Photo(s) WITH a measuring tape from the edge of the panel to the bottom end clamp - do this for every array

  • Photo(s) WITH a measuring tape from the edge of the panel to the top end clamp - do this for every array

  • Has the panels been strung as to the original design on the job pack

  • Take a picture of the stringing configuration (Has it been strung to the OG design)

  • Is they a jumper cables between panel arrays

  • Take a picture of ALL jumper cables used and prove they have been secured (with copex etc)

  • Does the system have an optimizer(s)?

  • Take a picture of all Optimizer serial numbers and make a note of where they are in a array (must draw a picture)

  • Example photo of optimizer layout - (Instead of numbers I need serial numbers of the optimizer to the corresponding panel)

    optimizer layout.JPG
  • Any damages on the panels (scratches, bumps or scrapes)

  • Photo(s) of solar array(s) taken from ground - if visible from the ground

  • How many roofs is solar being installed on ?

Declarations and Proof

  • I confirm I have visually inspected the DC cables including exit to panels through roof tiles and confirm there are no damages? (other than minor superficial scratches)

  • I confirm I have visually inspected the roof, panels and cables for damage and mechanical/UV protection?

  • I confirm there are no cables or connectors resting on roof tiles and all are properly fixed to structures in accordance to the manufacturers?

  • I confirm any damages incurred during installation have been rectified

  • I confirm the roof is water tight and there are no leaks or potential entries for water ingress - post installation

  • I confirm all mess made during install has been cleaned and the site has bee left in a safe state (take a pic of site post installation)

  • Have you left the ladder guard on the ladder when leaving site to ensure no-one can access the scaffolding ?

Customer sign off

  • I confirm this installation has been installed within MCS guidelines and the customer is happy and content with installation

  • Customer signature - confirming their are happy with installation

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.