Title Page

  • Support Specialist Name

  • Site Name

  • Installation type(s)

Project Review Items: (In comments section add S/N, Article #, Case #, and attach pictures as applicable)

General:

  • Where you able to 100% complete the installation?

  • Were you involved in all phases of the project?

Licenses, Delivery, & SPOs: (Please elaborate as necessary by entering additional details, Case #s, and/or pictures, etc. if necessary)

  • Were licenses able to be checked 2 weeks prior to installation start?

  • Were any license corrections needed before installation?

  • If needed, were necessary license corrections obtained before installation start? (If marked 'No' to parent question then please N/A)

  • Were you required to SPO any items/features prior to installation start? (Please comment # of SPOs placed in each section)

  • If required, were these SPOs processed in a timely matter and received prior to installation start? (If 'No' please comment whether or not this affected the timeline.)

  • Were any of these items due to instruction, presently or previously indicated by NTS / PSE as necessary for this type of project? (SW updates, known parts, etc.)

  • Were license corrections or SPOs needed after installation start?

  • Were these processed in a timely manner and did they negatively affect the timeline? (If marked 'No' to parent question then please mark N/A)

  • During Inventory, were any items on the delivery note found to be missing from the shipment or incorrect?

  • Were any items delivered damaged or DOA?

  • Were there any articles ordered via SPO that were processed as a result of quotation error?

  • Were there any articles ordered via SPO that were processed as a result of order entry error?

  • Did you place any SPO for parts for any other reason?

  • Do you feel NTS/PSE group should be notified regarding any articles ordered via SPO as they may affect future installations or service?

  • Were there any issues related to storage area? (size, location, accessibility, etc.)

  • Were there any significant setbacks, extra hours worked, or timeline delays incurred due to items mentioned in this section?

  • For any problems encountered for items mentioned in this section, do you feel this could this have been prevented or can be prevented for future projects?

  • Any additional feedback or suggestions regarding licenses, delivered items, or SPOs?

  • Please input number of total SPOs placed to complete this project.

  • Please rate the amount of time and effort you feel was required to resolve any problems encountered in this section. (1 represents minimal amount and 10 represents the most, use 0 rating only if N/A)

Workstations, servers, software and IT: (Add additional comments as necessary)

  • If applicable, did IT appear sufficiently informed regarding their role in the project?

  • Were there any problems encountered coordinating completion of IT tasks or obtaining IT assistance?

  • Were there any problems encountered regarding workstation, server, or software installation?

  • Were there any problems with software and/or hardware compatibility?

  • Were there any significant setbacks, extra hours worked, or timeline delays incurred due to items mentioned in this section?

  • For any problems encountered for items mentioned in this section, do you feel this could this have been prevented or can be prevented for future projects?

  • Any additional comments or suggestions related to software installation or IT related tasks?

  • Please rate the amount of time and effort you feel was required to resolve any problems encountered in this section. (1 represents minimal amount and 10 represents the most, use 0 rating only if N/A)

  • Please rate overall performance of IT Staff (1 is the worst rating and 10 is the best, Please use a rating of 0 ONLY if N/A)

3rd Party Systems (Add additional comments as necessary)

  • If applicable, did 3rd party appear sufficiently informed regarding their role in the project?

  • Were any problems encountered with coordination and completion of 3rd party integration items or obtaining necessary assistance/support?

  • Post-integration, were there any further setbacks encountered related to 3rd party integration features?

  • Any additional setbacks encountered related to 3rd party systems?

  • For any problems encountered for items mentioned in this section, do you feel this could this have been prevented or can be prevented for future projects?

  • Any additional comments or suggestions related to integration 3rd party systems?

  • Please rate the amount of time and effort you feel was required to resolve any problems encountered in this section. (1 represents minimal amount and 10 represents the most, use 0 rating only if N/A)

  • Please rate overall performance of 3rd Party staff (1 is the worst rating and 10 is the best, Please use a rating of 0 ONLY if N/A)

Contractor / Electrician / Facilities: (Add additional comments as necessary)

  • If applicable, did construction / electrician appear sufficiently informed regarding their role in the project?

  • If applicable, was construction and/or electrical pre-installation work completed adequately before arrival on site?

  • If any problems were encountered for items mentioned in this section, do you feel this could this have been prevented?

  • Any setbacks encountered related to coordination or completion of Construction or Electrical items?

  • For any problems encountered for items mentioned in this section, do you feel this could this have been prevented or can be prevented for future projects?

  • Any additional comments or suggestions related to construction or electrician tasks?

  • Please rate the amount of time and effort you feel was required to resolve any problems encountered in this section. (1 represents minimal amount and 10 represents the most, use 0 rating only if N/A)

  • Please rate overall performance of construction / electrician (1 is the worst rating and 10 is the best, Please use a rating of 0 ONLY if N/A)

Technical support, tools, training, and documentation

  • If you required support from NTS or PSEs during installation preparation, do you feel your support needs were met adequately and you were appropriately prepared for the project?

  • If you required support from NTS or PSEs during the installation, were they able to successfully and efficiently resolve any problems encountered?

  • Were there any insufficiencies or errors noted in any utilized service documentation?

  • Were any problems encountered during acceptance testing that may require attention?

  • Were there any problems or errors encountered with regards to acceptance documentation itself?

  • Do you feel you were appropriately trained to perform the work you were required to complete on site?

  • Do you feel that the tools provided to you were appropriate for the tasks completed?

  • Any additional comments or suggestions regarding NTS / PSE performance?

  • Any additional comments or suggestions regarding training, tools, or documentation?

  • Please rate overall performance of the NTS / PSE group (1 is the worst rating and 10 is the best, Please use a rating of 0 ONLY if N/A)

Project Managment

  • Did the PM provide you the information and support necessary to appropriately complete your pre-installation preparation?

  • Was the site sufficiently prepared for your arrival?

  • Were you appropriately informed of the details concerning the scope of work to be performed on site?

  • Was the hand-off from the PM to you appropriate for the project?

  • Did the PM provide you sufficient support throughout the installation process?

  • If any problems were encountered that required PM assistance, was the PM able to successfully and efficiently resolve them?

  • Any additional comments or suggestions regarding PM performance?

  • Please rate overall performance of the PM group (1 is the worst rating and 10 is the best, Please use a rating of 0 ONLY if N/A)

Timeline and Cost: (Add additional comments as necessary)

  • Was installation completed as originally scheduled (on time)?

  • Do you feel the amount of time allotted for pre-installation preparation was adequate?

  • Do you feel the amount of time allotted for the installation timeline was adequate?

  • Were there any major items or events on which you feel significant unnecessary cost to Brainlab was incurred?

  • Were there any major items or events for which you feel an unnecessary amount of time was wasted during installation preparation?

  • Were there any major items or events on which you feel unnecessary time was wasted during the installation itself?

  • Any additional comments or suggestions related to installation preparation time?

  • Any additional comments or suggestions related to the installation timeline?

  • Any additional comments or suggestions for areas where cost-savings can be achieved?

Customer Interaction & Satisfaction: (Add additional comments as necessary)

  • Did the customer appear informed appropriately regarding the project details?

  • Any unique challenges encountered with this customer or site specifically?

  • Were there any particular areas in which the customer was unhappy with Brainlab performance for this installation?

  • Any additional comments regarding customer interaction or satisfaction?

  • Please rate the perceived customer satisfaction with the overall Brainlab installation process. (1 being completely unsatisfied and 10 being completely satisfied.)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.