Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Entry Area

  • All fencing and barriers in position

  • Directional and compliance signage in position prior to entry gates

  • Bus drop off area constructed and operational

  • Queuing systems installed and safe

  • Cloaking area set up and ready for operation

  • PA system in position and operational

  • Bag check tables and ID scanners in position

  • Ticketing system set up

  • First aid area set up

  • Police area set up

  • Directional signage and barriers located after entry

Amenities

  • All toilet facilities are open

  • Hand washing facilities and consumables in place (toilet paper etc)

  • Suitable signage in place

Structures /Marquees etc

  • All marquees and other structures are complete and safe for use (as per installers sign off)

  • Power supplies and lighting supplied to all structures. Installed correctly

  • All equipment within structures operational and safe

  • Back of house areas secured

  • Food and drink available for purchase

  • Fire extinguishers in position and checked to confirm that they are operational

Stages

  • All stages and scaffolding have been signed of by engineers and deemed safe for use

  • Barriers at front of stages complete. Checked for safety hazards (pinch points, clear access)

  • Equipment positioned and ready for use.

  • Staff in position and informed of their responsibilities during an emergency

  • Sound and lighting systems installed and operational

  • Fire extinguishers in position and checked that they are operational

  • All public areas clear of equipment, obstructions and rubbish

  • Sharp or protruding edges rectified

  • Stage and platform edges marked and safety railings etc fitted as needed. Steps clearly marked

  • All overhead lighting etc fitted with safety wires

  • All trip and fall hazards made safe (cables etc across walkways)

Amusement Rides / External Entertainment

  • All equipment installed as per safety requirements

  • All necessary compliance documents sighted

  • Fire extinguishers fitted and operational

  • All public areas cleared of obstructions, rubbish etc

  • Necessary safety barriers lighting etc in position and operational

  • All electrical systems operational and safe

  • All staff are aware of necessary site safety procedures and evacuation requirements

  • Other issues

Emergency Requirements

  • Emergency control personnel on site and responsibilities identified

  • Emergency communications system operational

  • Control room operational and adequately manned

  • CCTV systems operational

  • Emergency exit signage in position

  • Emergency lighting /barriers etc available for use if required

  • Emergency communications equipment tested and operational

Staffing

  • Security staff in position briefed and aware of emergency procedures

  • Event staff in position and briefed. All made aware of emergency procedures

  • Cash staff in position and briefed

  • Police on site and in position.

  • Medical personnel on site and all facilities are manned.

  • Fire personnel on site and equipment set up

  • Catering personnel in position ready for trade

General

  • All vehicles off site.

  • Other issues

  • Other issues

  • Other issues

Venue cleared for opening

  • Select date

  • Safety Officer

  • DCW

  • Chief Warden

  • Security Manager

  • Other

  • Other

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.