Title Page
-
Conducted on
-
Prepared by
-
Location
Checklist
-
Date:
-
Program
Prior to Run
-
Has part traceability been set up? (Are labels set up and working correctly?)
-
Has the packaging been defined, and the work instructions updated?
-
Have spare parts been ordered? (Including parts/components with long lead times, or any items that could potentially stop production)
-
Has the training matrix been updated?
-
Is the training rollout plan completed?
-
Is there a trained primary and back-up team member, and are the trained operators available for the PDR?
-
Have all set up parts, been removed from the area?
-
Is the correct racking/packaging available?
-
Are all components in the area FIFO, and parts coming to area also FIFO?
Layout
-
Is the floor layout complete with the correct number of operators?
Documentation
-
W.I. completed?
-
Control Plan completed?
-
Process Flow completed?
-
PFMEA completed?
-
Is there a separate rework W.I. completed or are rework methods identified in W.I.?
Red Rabbit Testing
-
Do the "red rabbit" test parts have specific location and are they labeled? (poka yoke checks)
-
Verify all Poka-Yokes are working correctly.
-
Is the "red rabbit" test frequency identified and verification of checks documented?
5S
-
Boundary sample board completed?
-
Is there a specific location identified for work instructions?
-
Non conforming part and component locations identified?
-
Has all equipment that requires calibration been calibrated with documented evidence?
-
Is all packaging clean and free from tape, dust, and debris?
Process Highlights
-
Process
-
Process Description
-
Total PDR hours to be completed
-
Total Parts Attempted
-
Cycle time
-
Number of good parts that must be produced
-
Maximum scrap/rework allowed
Comments
-
Comments
-
Completed by
-
Add signature