Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Carpenter
-
lot no:
-
Frame approved by building Surveyor
-
All strong backs under Possie-struts are not compromised
-
Walls / Ceilings boning up
-
Fireplace installed and gas connected
-
Insulation Installed as per Energy Report
-
Antenna installed
-
Garage Door Motor noggins installed
-
Stainless handrail noggins installed
-
Shower / Bath hook up completed by Plumber
-
Heating rough in complete
-
Cooling rough in completed
-
Electrical rough in completed and checked with plan
-
Alarm rough in
-
Fibre optic installed in Home as per plans
-
Ducted vacuum rough in
-
Manhole Framed for plasterer
-
Plaster pre call completed
-
Rangehood ducting completed
-
laundry / Mechanical ducting installed
-
Tiles in roof space
-
Dropped Ceilings framed as per plan
-
Stair Expansion noggins installed
-
Bathroom / ensuite / Pwd noggins installed for Fixtures
-
All cavities clear and free of mortar
Matrix updates list items below
-
Add signature