Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

  • Carpenter

  • lot no:

  • Frame approved by building Surveyor

  • All strong backs under Possie-struts are not compromised

  • Walls / Ceilings boning up

  • Fireplace installed and gas connected

  • Insulation Installed as per Energy Report

  • Antenna installed

  • Garage Door Motor noggins installed

  • Stainless handrail noggins installed

  • Shower / Bath hook up completed by Plumber

  • Heating rough in complete

  • Cooling rough in completed

  • Electrical rough in completed and checked with plan

  • Alarm rough in

  • Fibre optic installed in Home as per plans

  • Ducted vacuum rough in

  • Manhole Framed for plasterer

  • Plaster pre call completed

  • Rangehood ducting completed

  • laundry / Mechanical ducting installed

  • Tiles in roof space

  • Dropped Ceilings framed as per plan

  • Stair Expansion noggins installed

  • Bathroom / ensuite / Pwd noggins installed for Fixtures

  • All cavities clear and free of mortar

Matrix updates list items below

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.