Information

  • Audit Title

  • Prepared by

  • Conducted on

  • Location
  • Project Name / Job Number

  • Document No.

  • Personnel

Questions

Load Information

  • Time and date of lift

  • Description of load being lifted

  • Load weight:

  • Block and rigging weight:

  • Total weight being lifted:

  • Radius:

  • Boom length:

  • Supervisor full name

  • Signal person full name

  • Crane / Hoist Operator full name

  • Crane / Hoist Contractor

Pre-Lift Checks

  • Has a JHA been completed?

  • Has a pre-lift meeting taken place?

  • Have all owners, subcontractors and other trades been informed of lifting operations?

  • Have all involved personnel (including those named above) completed the required training relevant to their lift duties?

  • Attach photos of operator licenses

  • Have weather conditions been considered?

  • Wind conditions are safe and will be monitored over entire lift?

  • At what wind speed is the lift shut down at?

  • Has communication procedures been established?

  • If using radios to signal the crane, has the radio communication procedure been made clear to all personnel?

  • Are Hand Signal charts are on site?

  • Have signals have been reviewed between operator, signal person(s) and rigging person(s)?<br>

  • Have materials to be hoisted been confirmed and has rigging methods been confirmed?<br>

  • Has all rigging passed a visual inspection and is appropriate for the material being hoisted?<br>

  • Full name of rigging inspector

  • Is a tag line being used?

  • Detail why tag line is not in use for this lift?

  • Do the ground conditions appear to be acceptable for crane set up?

  • Are outriggers fully extended with tires off the ground?

  • Are proper crane mats (if required) placed under outrigger floats and at a 90 degree angle to the outrigger cylinder?

  • Are the mats in good condition and of adequate size?

  • Has crane/hoist been inspected and deemed safe prior to this lift?

  • Are crane/hoist inspection records up to date?

  • Is the swing area barricaded to prohibit entry of unauthorized personnel (danger tape, ropes or flags)?<br>

  • Are all non-essential personnel removed from the area?

  • Have you assigned a designated spotter for this lift?

  • Full name of Spotter

  • Is there safe clearance between near power lines and every portion of the lifting operation, including crane/hoist, personnel and lift path?

  • Has anyone walked the load down to ensure that there are no loose items that can fall?

Sign Off

  • We the undersigned that the above is a true and correct reflection of checks that occurred before this lift occurred.

  • Signature & Full Name of Crane Operator

  • Signature & Full Name of Site Foreman

  • Signature & Full Name of Safety Personnel

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.