Title Page

  • Project

  • Date of Audit

  • Compliance Auditor

  • HSE Manager(s)

  • Operations Manager

Hunter Management System- Structure and Documentation

1. Hunter Management System- Structure and Documentation

  • 1.1 - Project folder created and Management System structure in place?

  • 1.2 - Information saved correctly and in the correct structure?

  • 1.3 - Construction Phase Plan available, up to date and of good quality?

  • 1.4 - Traffic Management Plan, Waste Plan and Fire Risk Assessment in place, up to date and of good quality?

  • 1.5 - Suitable Preconstruction Information in place including Asbestos R&D survey?

  • 1.6 - Signed appointment letter in place?

  • 1.7 - F10 in place and correct?

  • 1.8 - Site induction of a high quality and covering all site specific information?

2. Hunter Management System- Contractors and Personnel

  • 2.1 - Folder created for all contractors on site?

  • 2.2 - All required information requested from contractors?

  • 2.3 - Contractor and Personnel register fully utilised?

  • 2.4 - Training certificates for personnel in place and added to the register?

  • 2.5 - Site Personnel information in place (as referenced in table 1)

  • 2.6 - RAMS in place and approved (as per table 2)

3. Hunter Management System- Site Compliance

  • 3.1 Previous day permits saved onto the system?

  • 3.2 Authorisation to work permits in place for all contractors?

  • 3.3 Permits fully completed and of a high standard?

  • 3.4 Permit register fully utilised?

  • 3.5 All plant and machinery given a PUWER ID?

  • 3.6 All documentation in place for plant and machinery?

  • 3.7 Pre-use inspections carried out where required?

  • 3.8 PUWER register fully utilised?

  • 3.9 All Temporary Works been identified?

  • 3.10 Have all required inspections taken place?

  • 3.11 Safety observation recorded?

  • 3.12 Safety observations closed out?

  • 3.13 Site diaries and scorecards completed and sent to the client?

4. Site Office

  • 4.1 Signage in place with HSE Manager details?

  • 4.2 Office tidy and well organised?

  • 4.3 Project Information Board in place and fully utilised?

  • 4.4 Commitment Safety Board in place and signed by all inducted contractors?

  • 4.5 Permit Board in place and displaying all live permits?

  • 4.6 Attendance registered in place and completed correctly?

5. Site Set Up and Arrangements

  • 5.1 Site access fully controlled?

  • 5.2 Hunter signage in place across the site?

  • 5.3 Site First Aiders identified?

  • 5.4 First aid supplies in place?

  • 5.5 Appropriate means of raising an alarm in the event of an emergency in place?

  • 5.6 - Fire Marshall identified and a roll call procedure in place?

  • 5.7 - Escape routes adequate well signed and kept clear?

  • 5.8 - Appropriate number of fire extinguishers available?

  • 5.9 - Fire Assembly Point identified?

  • 5.10 - Suitable and adequate welfare facilities in place appropriate to the number of contractors?

  • 5.11 - Suitable smoking area identified?

  • 5.12 - Suitable separation of pedestrians / vehicles?

  • 5.13 - Site generally clean, tidy and are materials stored safely?

6. Working at Height

  • 6.1 - Working at Height permits in place for all works?

  • 6.2 - Working at height activities controlled correctly?

  • 6.3 - Statutory examinations and inspections in place?

  • 6.4 - Individuals trained and competent to undertake works?

7. Hot Works

  • 7.1 - Hot Works permits in place for all works?

  • 7.2 - Hot work activities controlled correctly?

  • 7.3 - Work area suitable for Hot Works?

  • 7.4 - Fire watch procedure implement?

  • 7.5 - Individuals trained and competent to undertake works?

8. Excavations

  • 8.1 - Excavation permits in place for all works?

  • 8.2 - Safe digging practices in place?

  • 8.3 Excavations adequately shored/battered back and is there adequate edge protection?

  • 8.4 Excavations suitably protected with signage in place?

  • 8.5 Suitable access / egress to excavations?

  • 8.6 Structures close by unaffected by the excavation?

  • 8.7 Statutory inspections being carried out?

  • 8.8 Individuals trained and competent to undertake works?

9. Confined Spaces

  • 9.1 Confined Spaces permits in place for all works?

  • 9.2 Confined spaces operations controlled correctly?

  • 9.3 Suitable isolations carried out?

  • 9.4 Rescue procedures in place?

  • 9.5 Individuals trained and competent to undertake works?

10. Electrical

  • 10.1 Electric permits in place for required works?

  • 10.2 LOTO Procedures in place and followed as required?

  • 10.3 Electrical works controlled correctly?

  • 10.4 Electrical equipment battery operated or 110v?

  • 10.5 Electric supply cables adequately positioned and protected?

  • 10.6 Portable appliance testing in place and up to date?

  • 10.7 Cables and leads in good condition and suitably protected?

11. Lifting Operations

  • 11.1 - Lifting permits in place for all works?

  • 11.2 - Lifting operations controlled correctly?

  • 11.3 - Statutory examinations and inspections in place?

  • 11.4 - Suitable segregation in place?

  • 11.5 - Weather conditions reviewed prior to lifting?

  • 11.6 - Individuals trained and competent to undertake works?

12. Health Hazards and PPE

  • 12.1 - Provisions in place to reduce workplace exposure to noise?

  • 12.2 - Provisions in place to reduce operators' exposure to vibration?

  • 12.3 - Appropriate measures in place to control excessive dust?

  • 12.4 - Manual handling tasks assessed, and activities controlled

  • 12.5 - COSHH assessments available for any hazardous materials in use?

  • 12.6 - Five points of PPE in place?

  • 12.7 - Appropriate PPE available, in use and in good condition, including task specific PPE?

Auditor Summary

  • 13 - General Comments and Impressions:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.