Title Page
-
Site conducted
-
Conducted on
-
Auditor
-
Process
-
Part number
Verification of production steps
Routing
-
Is a Job card available? enter WO No.
-
Part number and issue
-
Drawing number and issue
-
Customer name
-
Purchase order and / or sales order number
-
Are operations stamped and dated?
-
Have these been done in sequence?
-
If rework has been identified has it been documented on the route card?
-
Is a FAIR Required?
-
Is there a requirement for first off inspection to be carried out and has this been done?
Calibration
-
Are all gauges in use calibrated and labelled with an expiry date?
Material
-
Has material been issued to job?
-
Raw material batch numbers
-
Material specification
-
Size (if applicable)
Supply Chain
-
Are sub con operations listed?
-
Are batch numbers for sub con process listed and traceable?
-
Are the suppliers on our Approved supplier list?
Training
-
Verify by checking scope of approval / skills matrix)
-
Please list all personnel who have been consulted during the audit
NCR Control
-
Has an NCR been raised for any this part?
-
Has the NCR number been noted on job card?
-
If any have been identified have the items been clearly labelled and segregated?
-
Has the part been logged on the NCR log?
-
Has any rework taken place? Is traceability maintained.. E.g. Paint touch up - have batch numbers been recorded?
Final Inspection
-
Have in process inspection operations been completed?
-
Does routing identify inspection is to take place?
-
Is the Correct part identification applied?
Despatch
-
Has Certificate of Conformity been raised?
-
Please check the following
-
Correct quantity
-
Correct customer release statement.
-
Signed by approved signatory
-
Packaging and Preservation
-
Are customer requirements documented on the job card for specific packaging?
-
(Kit boxes / bubble wrap / customer supplier box) required and available?
-
Any sign of damage to packaging?
Documentation
-
Are all forms in use at the time of audit registered as a form within the QMS?
Special Processes
HEAT TREATMENT
-
Is Heat treatment called up on the drawing/routing?
-
Are System Accuracy tests (SATs) up to date?
-
Description S/N Date Calibrated Date Due
-
Is there a chart, or equivalent document, attached to the oven to show the working zone and working temperatures, and is processing being completed within these limits?
-
Is the operator approved for the process?
-
"Dose the route / job provide clear process instructions?
-
Temperature range
-
Time in / out to be recorded
-
Customer specifications and/or internal SOP's listed.
-
Are there instructions for part separation in the furnace and are the parts viewed separated sufficiently.
-
Are test pieces available for the heat treatment process?
Furnace
-
Is their a separate record sheet in use to record processing times?
-
Quench Tank
-
Is temperature monitored and controlled?
-
Is the water circulated/ agitated?
-
Is calibrated timer used?"
-
Are quench delays timed and recorded?
Freezer
-
Is the freezer calibrated?
-
Is freezer suitable for the product stored?
-
Are items logged into and out of the freezer correctly?
-
Check that freezer is only used for heat treatment production items
WELDING
-
Is any Welding being carried out?
-
Is the operator approved for the process?
-
Are test pieces available for the welding method being performed?
-
Is there a record of materials used in creation of the weld?
-
Are weld rods controlled and identified?
-
Have waste rods been disposed of correctly?
-
Are all gauges used to control flow of gas calibrated?
-
Is there an approved data card in place to control the welding process and is it available to the operator and referenced on the route card?
-
Have all processing parameters been recorded on relevant paperwork or logs?
-
Check Equipment Calibration- equipment selected:
-
Description
-
Serial number
-
Calibrated date
CHEMICAL PROCESSING
-
Is any Chemical Processing carried out?
-
Is the operator approved for the process?
-
Have all processing parameters been recorded on relevant paperwork or logs?
-
Are all tank temperatures within specification limits?
-
Are all immersion times in compliance with routing requirements?
-
Are any delays between processes recorded and do they meet the requirements?
-
Check Equipment Calibration- equipment selected:
-
Description
-
Serial number
-
Calibrated date
NDT
-
Is any Non-destructive Testing carried out?
-
Is the operator approved for the process?
-
Is a valid approval certificate for the NDT method being used?
-
Have all processing parameters been recorded on relevant paperwork or logs?
-
Is the applicable process/datacard available for review? is it the correct revision/date?
-
Does the inspector have a valid annual assessment and eye test?
-
Are the daily, weekly and monthly checks up to date?
-
Check Equipment Calibration- equipment selected:
-
Description
-
Serial number
-
Calibrated date
ELECTRICAL BONDING
-
Is any Electrical Bonding carried?
-
Is there evidence that operators have been trained in the electrical bonding process?
-
Is the electrical bond test unit in calibration?
-
Is the electrical bond test result recorded on the route card, and is it within the limits requested on the route card?
-
Is there evidence of pre-cleaning operation if required.
-
Have all processing parameters been recorded on relevant paperwork or logs?
PAINT
-
Is any painting carried out?
-
Is the operator approved for the process?
-
Have records of paint mixing and application been retained, including batch numbers of product used?
-
Is viscosity verification completed if required for the paint specification?
-
Are paint containers identified - paint tins, mixed paint cups? Paint mix ref Batch no. Paint type
-
Are any delays between processes recorded and do they meet the requirements?
-
Are all paints stored within their shelf life?
-
Have the correct paints been used, and is there a clear link between the paints used and the route card?
-
Are mixing and application environmental conditions correct to requirements and are they recorded?
-
Check Equipment Calibration- equipment selected:
-
Description
-
Serial number
-
Calibrated date
ASSEMBLY
-
Is any Assembly carried out?
-
Is the operator approved for the process?
-
Have all processing parameters been recorded on relevant paperwork or logs?
-
Has the operator used the correct sealants, and is there a clear link between the sealant used and the sealant referenced on the routing?
-
Are the sealants used in date?
-
Have the sealants been labelled up clearly with an expiry time when they have been mixed
-
Has the operator logged the batch number for sealant used?
-
Has the operator mixed the sealant to correct ratio?
-
Are opened sealants stored correctly?
-
Are scales used for mixing of sealants calibrated, and are they accurate to 1% of the weight being measured?
-
Are the correct items present for assembly as per the works order list (i.e rivets, anchor nuts), and is there a trace to which batches have been used?
-
Is there a copy of the assembly drawing available to the operator?
-
Can the operator access relevant customer specifications for the job where required?
-
Check Equipment Calibration- equipment selected:
-
Description
-
Serial number
-
Calibrated date
Reporting
-
Signature of Auditor
-
Signature of Auditee. Any NCRs have been accepted as a true reflection of any findings