Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Project Details

  • Location

  • Date

  • Time

  • Present

  • Apologies

  • Minutes Taken By

  • PRM Minutes are filed at HRC Head Office for all employees to have access to.

Actions from Previous PRM

  • Is this the first PRM for this project?

  • Are all previously raised NCR's closed out?

  • What Non-Conformances are outstanding from the last PRM?

Project Health and Safety

  • Has a site specific induction been completed for all HRC employees and applicable contractors?

  • Do all employees and contractors on site that are employed by HRC have a White Card?

  • Has Operator ticket/qualification been checked prior to commencing work and copies filed?

  • Does HRC Administration have colour copies of all Operator's tickets/qualifications?

  • Have all Plant operators been assessed as competent by the Project Manager, Site Engineer, Site Foreman or Trainer Assessor? (VOC Form Completed)

  • Have all employees and applicable contractors been assessed as competent in identifying and implementing the correct PPE for the task?

  • Are all employee and applicable contractors competent in the Environmental requires for the site?

  • Do all HRC employees and applicable contractors have access to company policies and procedures - either electronically or hard copies?

  • Are all workers under HRC control wearing required PPE as per SWMS?

  • Are the Monthly WHS statistics up to date for this project?

SWMS and Risk Assessment

  • Are SWMS present on site?

  • Have all applicable site personnel been inducted into SWMS and have they signed the appropriate pages?

  • Do SWMS specify appropriate controls to eliminate or minimise identified hazards?

  • Have the controls specified in the SWMS been implemented on site?

  • Have the SWMS been reviewed monthly or after any safety incident occurs?

  • Have prestart inspections been conducted for ALL Plant and equipment on a daily basis?

  • Have workers been given the opportunity to provide feedback and/or consultation?

Hazard Identification and Risk Assessment

  • Has a Hazard Identification and Risk Assessment Form been completed for this project?

  • Is the H.I.R.A being reviewed every 3 months or after any safety incidents?

  • Is the risk rating of the hazards appropriate?

  • Are the controls identified adequate and implemented properly?

PPE

  • Is the PPE fit for the purpose of the project?

  • Are all workers under HRC control wearing the required PPE as stated in the SWMS?

Site Office Cleanliness

  • Is the level of cleanliness & tidiness in the site office and amenities acceptable?

  • Is office waste stored in the correct bins?

First Aid & Emergency

  • Is a First Aid Kit present and complete?

  • Is a qualified First Aid person on site?

  • Is the First Aid Contact and Emergency Procedures in a location for all to see?

  • Are emergency drills being conducted?

  • Have emergency drills been documented on the appropriate form?

Hazardous Materials & Asbestos

  • Are all data sheets in the MSDS folder current? (Less than 5 years old)

  • Are data sheets for all hazardous materials onsite or available onsite through electronic devices?

  • Are chemicals stored in the correct containers?

  • Are the containers in which chemicals are stored labelled correctly?

  • Is compliance to procedures apparent regarding the storage of oxy, acetylene and fuels?

  • Is the Asbestos Management Plan available onsite and being followed completely and correctly?

  • Is the Asbestos register completed?

  • Are chemicals being stored incompatible in proximity to others in the same location?

  • Is there adequate spill containment equipment or bunding in place?

Fire fighting Equipment

  • Is there at least one Fire Extinguisher in the office/lunchroom and are there Fire Extinguishers on all Plant & Vehicles?

  • Are all Fire Extinguishers on site in test date?

  • Is the Fire Extinguisher clearly signed and labelled?

Electrical Equipment

  • Is the Electrical Tagging Register being maintained?

  • Is electrical tagging up to date?

  • When is the date of next inspection?

  • What is the number of untagged pieces of equipment on site?

Lifting Equipment

  • Is lifting equipment gear recorded in the Lifting Gear Register?

  • Does all lifting gear have a current test certificate?

  • Prior to use, is lifting gear inspected by a competent person to check for defects?

  • Does any lifting equipment require inspection or replacement?

  • What type of lifting equipment gear needs inspection or replacement?

  • Is lifting gear stored correctly?

  • SWL information displayed as per Australian Standard?

Working at Heights Equipment

  • Fall from heights risk (including voids, pits and trenches) controlled?

  • Is there a working at heights permit for harness as the primary control in place before work commences?

  • Has the working at heights equipment been inspected by a competent person?

  • Is the working at Heights Harness tagged?

  • If working at heights on site is there a working at heights rescue plan in place?

  • Is there a VOC and formal training in place for all working at heights?

Authorities & Permits

  • Are Hot Works Permits implemented as per permit instructions?

  • Are Permit to Excavate forms implemented as per procedure?

  • Are Confined Space Permits implemented as per procedure?

  • Have works been held until relevant authorities and permits been received?

  • Are hard copies of all permits/authorities stored in the appropriate folder onsite?

Standpipe

  • Standpipe Number

  • Standpipe meter reading

  • Picture of standpipe reading? (If applicable)

Sound Meter

  • Has a sound meter reading been taken on site this month?

  • What is the Decibel reading on site?

Hazardous Manual Handling Tasks

  • Is manual handling tasks in place?

  • Are manual handling risks identified in SWMS?

  • Are adequate manual handling controls in place?

Site Access

  • Is site access controlled?

  • Have there been any blockages or loss of time due to site access?

  • Please provide further details in regards to the blockage and/or loss of time issue due to site access.

Traffic Management Plan

  • Is there a Traffic Management Plan or Vehicle Movement Plan in place for the site?

  • Is traffic control in place?

  • Are there personnel trained in traffic control?

  • What ticket/qualifications do these personnel have?

  • Is there live traffic seperation in place?

  • Is pedestrian access maintained?

  • Are controls adequate and implemented as per the Traffic Management or Vehicle Movement Plan?

Electrical Hazards

  • Are there any electrical leads or tools that are damaged, out of test date or untested?

  • Please provide more information in regards to damaged, untested or out of test date leads or tools.

  • Are any leads placed on the ground, on work surfaces, near sharp or metal structures or not on isolating hooks?

  • Are any ELCB, RCD's or powerboards overloading outlets?

  • Are there any leads/equipment near water, flammables, chemicals or anything that may be damaged from contact with moving machinery or plant?

Environment

  • Is there a CEMP in place for the project?

  • Are all applicable workers inducted into the CEMP?

  • Are all applicable workers inducted into the environmental requirements of the site?

  • Has the CEMP been issued to the Supervisor, Personnel on site and the Client?

  • Are activities identified in the CEMP being implemented appropriately?

  • Are silt fences and other environmental controls installed and being maintained?

  • Are safety and environmental checklists being conducted weekly?

Environmental Controls

  • Is there a system in place to prevent contaminants entering stormwater, waterways or exiting site (sediment controls)

  • Is stabilised access in place?

  • Are sediment fences in place and correct?

  • Are stockpiles covered?

  • Is dust suppression required?

  • Are we re-using stored water or other natural elements on site?

  • Has all captured sediment been removed?

  • Are excess noise controls and monitoring in place?

  • Are vibration controls and monitoring in place?

  • Have any Environmental NCR's been issued?

  • What has been the nature of these NCR's?

  • Have any EPA/DECCW/Council infringement notices been issued?

  • What was the details in regards to these infringement notices?

Waste Management

  • Is waste material stored in correct containers/locations?

  • Are bins emptied on a regular basis?

  • Are waste tracking (tipping sheets) up to date?

  • Is management of special waste being conducted as per the CEMP?

  • Is lifecycle management of waste on site considered?

  • Is regulated waste transported to the correct facility?

Training Management

  • Has any training occured this month via this site?

  • What training has occured? Please provide more details.

  • What is the total work hours for this month?

  • Is a site-specific induction book available on site?

  • Have there been any re-inductions on this project since the last PRM?

  • Who was re-inducted and why?

  • Are toolbox talks conducted at least once a week, preferably daily, and do they address site-specific incidents, hazards or safety issues?

  • Do workers have the skills, competencies and experience to undertake the work safely?

  • Is any additional training required?

  • What additional training and for whom?

Work Related Incidents

  • Have there been any work related incidents since last PRM?

  • Please provide more details in regards to the incident.

  • Are all incident reports up to date and filed?

  • Have incident investigations been carried out and corrective/preventative action implemented?

  • Have there been any new Workers Compensation claims for this project?

  • Please provide more details in regards to any Workers Compensation claims for this project.

Project Specific

  • How many days/weeks/months have been spent on this project?

  • Are we running in front or behind on this project?

  • How much have we currently spent on this project? Are we on budget?

  • How much have we spent on rectifying faults and/or defects to date?

  • What is the total number of NCR's issued for this project?

  • What number of these NCR's have been closed out in this period?

Document Management

  • Are daysheets up to date?

  • Is the drawing register up to date?

  • Is the daily site checklist up to date?

  • Is the density test register up to date?

  • Is the PPE register up to date?

  • Are plant fuel logs being used and up to date?

  • Are pre-delivery plant inspection forms being used for all hired-in-plant?

  • Is the visitors register being used and up to date?

  • Are visitors being inducted via the visitor site induction form?

  • Are drawings up to date?

  • Do any drawings need to be mended or reissued due to poor physical damage?

  • If yes, which drawings need reissuing?

  • Are all documents filed appropriately? This includes signed policies, procedures and evacuation plans on the wall

  • What is the level of organisation of all job-related paperwork (including QA records, dockets, tests reults etc into correct folders)

Infrastructure

  • Please list the HRC owned plant currently on site

  • Does any of the Plant or equipment on site require maintenance?

  • Has HRC Administration been notified so they can organise repairs/maintenance?

  • Are all Pre-start inspections on Plant & Equipment being completed?

  • Are pre-start-up inspections on Subcontractors Plant & Equipment being completed?

  • Are all Subcontractor Operators trained, assessed and verified as competent?

  • Please list all electronic equipment on site (Computers, printers, modems, routers, mobile phones etc on site)

Project Planning & Review

  • Is the Project Plan available on site?

  • Does the Project Manager or Supervisor regularly review and update the construction program?

  • Is there an up-to-date construction program in the site office?

Process Control

  • Are there ITP's for every construction process specified in the Project Plan?

  • Do ITP's show logical work sequence, inspection and test point, survey checkpoints and any client Hold Points or Witness Points?

  • Have Hold Points & Witness Points been approved by the Client prior to proceeding to the next step?

  • Have any activities been identified as Special Processes?

  • If yes, which activities?

  • The current state of ITP's for this project can be best decribed as:

Purchasing

  • Are there any Critical Contracts identified in the Project Plan?

  • Are critical contracts issued a Purchase Order Form?

Handling, Storage and Delivery

  • Are special requirements for storage, handling & delivery to be detailed in ITP and SWMS?

  • What special requirements need to be detailed in ITP & SWMS?

  • Do all incoming materials have a valid SDS?

  • Are any special unloading procedures necessary?

  • If yes, what procedures?

Lots, Components & Batches

  • Has a lot register been established and maintained?

  • Is imported material recorded in the Truck Importing Fill Sheet?

  • Is incoming material checked for conformity on the incoming materials checklist?

  • Is material carted from site recorded in the Truck Tipping Sheet?

  • Is placement of concrete in each lot recorded in concrete traceability sheet?

Inspection & Testing

  • Do client-supplied products meet specified requirements?

  • Do all ITP's have inspection and test records attached? (This may include: Verification checklists, test reports, compliance certificates, weighbridge dockets, survey reports, NCR and NCR register etc)

Survey Control

  • Are all set out surveys made from control stations established by the client?

  • Are additional stations established from the original control's stations by a qualified engineering surveyor or registered surveyor?

Control of Monitoring & Measuring Devices?

  • Is the measuring equipment site register being maintained?

  • Are two-peg tests conducted prior to any critical levelling activity?

  • Are two-peg tests recorded in register?

  • Does any of the equipment require calibration?

  • If yes, which equipment requires calibration?

Service Search

  • Has information been obtained from Dial-Before-You-Dig?

  • Are related plans/information kept in site file?

  • Is a service search conducted according to procedure?

Client Satisfaction

  • Is the client satisfied with our work?

  • What has been client feedback?

  • Have there been any complaints from the Client or local community?

  • What has been the complaints from the Client or local community?

  • If an incident/improvement/non-conformance report was completed, was it forwarded to the client within 24 hours?

Control of Non-Conformances

  • Is the NCR Register up to date?

  • Is the project monitored for non-conformances including safety, environmental, procedures not documented properly, forms not completed as per their procedure etc

  • For NCR's, have corrective and preventative actions been identified and documented in the NCR/PAR form?

  • Have NCR's been closed out?

Improvement

  • Are there any opportunities to make construction processes or work methods or management systems more efficient or effective?

  • If yes, what opportunities?

  • Has this opportunity been documented in an incident/improvement report form?

Closing out

  • Project Manager

  • Supervisor

  • Director

  • Project Administrator

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.