Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Project Details
-
Location
-
Date
-
Time
-
Present
-
Apologies
-
Minutes Taken By
-
PRM Minutes are filed at HRC Head Office for all employees to have access to.
Actions from Previous PRM
-
Is this the first PRM for this project?
-
Are all previously raised NCR's closed out?
-
What Non-Conformances are outstanding from the last PRM?
Project Health and Safety
-
Has a site specific induction been completed for all HRC employees and applicable contractors?
-
Do all employees and contractors on site that are employed by HRC have a White Card?
-
Has Operator ticket/qualification been checked prior to commencing work and copies filed?
-
Does HRC Administration have colour copies of all Operator's tickets/qualifications?
-
Have all Plant operators been assessed as competent by the Project Manager, Site Engineer, Site Foreman or Trainer Assessor? (VOC Form Completed)
-
Have all employees and applicable contractors been assessed as competent in identifying and implementing the correct PPE for the task?
-
Are all employee and applicable contractors competent in the Environmental requires for the site?
-
Do all HRC employees and applicable contractors have access to company policies and procedures - either electronically or hard copies?
-
Are all workers under HRC control wearing required PPE as per SWMS?
-
Are the Monthly WHS statistics up to date for this project?
SWMS and Risk Assessment
-
Are SWMS present on site?
-
Have all applicable site personnel been inducted into SWMS and have they signed the appropriate pages?
-
Do SWMS specify appropriate controls to eliminate or minimise identified hazards?
-
Have the controls specified in the SWMS been implemented on site?
-
Have the SWMS been reviewed monthly or after any safety incident occurs?
-
Have prestart inspections been conducted for ALL Plant and equipment on a daily basis?
-
Have workers been given the opportunity to provide feedback and/or consultation?
Hazard Identification and Risk Assessment
-
Has a Hazard Identification and Risk Assessment Form been completed for this project?
-
Is the H.I.R.A being reviewed every 3 months or after any safety incidents?
-
Is the risk rating of the hazards appropriate?
-
Are the controls identified adequate and implemented properly?
PPE
-
Is the PPE fit for the purpose of the project?
-
Are all workers under HRC control wearing the required PPE as stated in the SWMS?
Site Office Cleanliness
-
Is the level of cleanliness & tidiness in the site office and amenities acceptable?
-
Is office waste stored in the correct bins?
First Aid & Emergency
-
Is a First Aid Kit present and complete?
-
Is a qualified First Aid person on site?
-
Is the First Aid Contact and Emergency Procedures in a location for all to see?
-
Are emergency drills being conducted?
-
Have emergency drills been documented on the appropriate form?
Hazardous Materials & Asbestos
-
Are all data sheets in the MSDS folder current? (Less than 5 years old)
-
Are data sheets for all hazardous materials onsite or available onsite through electronic devices?
-
Are chemicals stored in the correct containers?
-
Are the containers in which chemicals are stored labelled correctly?
-
Is compliance to procedures apparent regarding the storage of oxy, acetylene and fuels?
-
Is the Asbestos Management Plan available onsite and being followed completely and correctly?
-
Is the Asbestos register completed?
-
Are chemicals being stored incompatible in proximity to others in the same location?
-
Is there adequate spill containment equipment or bunding in place?
Fire fighting Equipment
-
Is there at least one Fire Extinguisher in the office/lunchroom and are there Fire Extinguishers on all Plant & Vehicles?
-
Are all Fire Extinguishers on site in test date?
-
Is the Fire Extinguisher clearly signed and labelled?
Electrical Equipment
-
Is the Electrical Tagging Register being maintained?
-
Is electrical tagging up to date?
-
When is the date of next inspection?
-
What is the number of untagged pieces of equipment on site?
Lifting Equipment
-
Is lifting equipment gear recorded in the Lifting Gear Register?
-
Does all lifting gear have a current test certificate?
-
Prior to use, is lifting gear inspected by a competent person to check for defects?
-
Does any lifting equipment require inspection or replacement?
-
What type of lifting equipment gear needs inspection or replacement?
-
-
Is lifting gear stored correctly?
-
SWL information displayed as per Australian Standard?
Working at Heights Equipment
-
Fall from heights risk (including voids, pits and trenches) controlled?
-
Is there a working at heights permit for harness as the primary control in place before work commences?
-
Has the working at heights equipment been inspected by a competent person?
-
Is the working at Heights Harness tagged?
-
If working at heights on site is there a working at heights rescue plan in place?
-
Is there a VOC and formal training in place for all working at heights?
Authorities & Permits
-
Are Hot Works Permits implemented as per permit instructions?
-
Are Permit to Excavate forms implemented as per procedure?
-
Are Confined Space Permits implemented as per procedure?
-
Have works been held until relevant authorities and permits been received?
-
Are hard copies of all permits/authorities stored in the appropriate folder onsite?
Standpipe
-
Standpipe Number
-
Standpipe meter reading
-
Picture of standpipe reading? (If applicable)
Sound Meter
-
Has a sound meter reading been taken on site this month?
-
What is the Decibel reading on site?
Hazardous Manual Handling Tasks
-
Is manual handling tasks in place?
-
Are manual handling risks identified in SWMS?
-
Are adequate manual handling controls in place?
Site Access
-
Is site access controlled?
-
Have there been any blockages or loss of time due to site access?
-
Please provide further details in regards to the blockage and/or loss of time issue due to site access.
Traffic Management Plan
-
Is there a Traffic Management Plan or Vehicle Movement Plan in place for the site?
-
Is traffic control in place?
-
Are there personnel trained in traffic control?
-
What ticket/qualifications do these personnel have?
-
Is there live traffic seperation in place?
-
Is pedestrian access maintained?
-
Are controls adequate and implemented as per the Traffic Management or Vehicle Movement Plan?
Electrical Hazards
-
Are there any electrical leads or tools that are damaged, out of test date or untested?
-
Please provide more information in regards to damaged, untested or out of test date leads or tools.
-
Are any leads placed on the ground, on work surfaces, near sharp or metal structures or not on isolating hooks?
-
Are any ELCB, RCD's or powerboards overloading outlets?
-
Are there any leads/equipment near water, flammables, chemicals or anything that may be damaged from contact with moving machinery or plant?
Environment
-
Is there a CEMP in place for the project?
-
Are all applicable workers inducted into the CEMP?
-
Are all applicable workers inducted into the environmental requirements of the site?
-
Has the CEMP been issued to the Supervisor, Personnel on site and the Client?
-
Are activities identified in the CEMP being implemented appropriately?
-
Are silt fences and other environmental controls installed and being maintained?
-
Are safety and environmental checklists being conducted weekly?
Environmental Controls
-
Is there a system in place to prevent contaminants entering stormwater, waterways or exiting site (sediment controls)
-
Is stabilised access in place?
-
Are sediment fences in place and correct?
-
Are stockpiles covered?
-
Is dust suppression required?
-
Are we re-using stored water or other natural elements on site?
-
Has all captured sediment been removed?
-
Are excess noise controls and monitoring in place?
-
Are vibration controls and monitoring in place?
-
Have any Environmental NCR's been issued?
-
What has been the nature of these NCR's?
-
-
Have any EPA/DECCW/Council infringement notices been issued?
-
What was the details in regards to these infringement notices?
Waste Management
-
Is waste material stored in correct containers/locations?
-
Are bins emptied on a regular basis?
-
Are waste tracking (tipping sheets) up to date?
-
Is management of special waste being conducted as per the CEMP?
-
Is lifecycle management of waste on site considered?
-
Is regulated waste transported to the correct facility?
Training Management
-
Has any training occured this month via this site?
-
What training has occured? Please provide more details.
-
What is the total work hours for this month?
-
Is a site-specific induction book available on site?
-
Have there been any re-inductions on this project since the last PRM?
-
Who was re-inducted and why?
-
-
Are toolbox talks conducted at least once a week, preferably daily, and do they address site-specific incidents, hazards or safety issues?
-
Do workers have the skills, competencies and experience to undertake the work safely?
-
Is any additional training required?
-
What additional training and for whom?
Work Related Incidents
-
Have there been any work related incidents since last PRM?
-
Please provide more details in regards to the incident.
-
Are all incident reports up to date and filed?
-
Have incident investigations been carried out and corrective/preventative action implemented?
-
Have there been any new Workers Compensation claims for this project?
-
Please provide more details in regards to any Workers Compensation claims for this project.
Project Specific
-
How many days/weeks/months have been spent on this project?
-
Are we running in front or behind on this project?
-
How much have we currently spent on this project? Are we on budget?
-
How much have we spent on rectifying faults and/or defects to date?
-
What is the total number of NCR's issued for this project?
-
What number of these NCR's have been closed out in this period?
Document Management
-
Are daysheets up to date?
-
Is the drawing register up to date?
-
Is the daily site checklist up to date?
-
Is the density test register up to date?
-
Is the PPE register up to date?
-
Are plant fuel logs being used and up to date?
-
Are pre-delivery plant inspection forms being used for all hired-in-plant?
-
Is the visitors register being used and up to date?
-
Are visitors being inducted via the visitor site induction form?
-
Are drawings up to date?
-
Do any drawings need to be mended or reissued due to poor physical damage?
-
If yes, which drawings need reissuing?
-
Are all documents filed appropriately? This includes signed policies, procedures and evacuation plans on the wall
-
What is the level of organisation of all job-related paperwork (including QA records, dockets, tests reults etc into correct folders)
Infrastructure
-
Please list the HRC owned plant currently on site
-
Does any of the Plant or equipment on site require maintenance?
-
Has HRC Administration been notified so they can organise repairs/maintenance?
-
Are all Pre-start inspections on Plant & Equipment being completed?
-
Are pre-start-up inspections on Subcontractors Plant & Equipment being completed?
-
Are all Subcontractor Operators trained, assessed and verified as competent?
-
Please list all electronic equipment on site (Computers, printers, modems, routers, mobile phones etc on site)
Project Planning & Review
-
Is the Project Plan available on site?
-
Does the Project Manager or Supervisor regularly review and update the construction program?
-
Is there an up-to-date construction program in the site office?
Process Control
-
Are there ITP's for every construction process specified in the Project Plan?
-
Do ITP's show logical work sequence, inspection and test point, survey checkpoints and any client Hold Points or Witness Points?
-
Have Hold Points & Witness Points been approved by the Client prior to proceeding to the next step?
-
Have any activities been identified as Special Processes?
-
If yes, which activities?
-
The current state of ITP's for this project can be best decribed as:
Purchasing
-
Are there any Critical Contracts identified in the Project Plan?
-
Are critical contracts issued a Purchase Order Form?
Handling, Storage and Delivery
-
Are special requirements for storage, handling & delivery to be detailed in ITP and SWMS?
-
What special requirements need to be detailed in ITP & SWMS?
-
Do all incoming materials have a valid SDS?
-
Are any special unloading procedures necessary?
-
If yes, what procedures?
-
Lots, Components & Batches
-
Has a lot register been established and maintained?
-
Is imported material recorded in the Truck Importing Fill Sheet?
-
Is incoming material checked for conformity on the incoming materials checklist?
-
Is material carted from site recorded in the Truck Tipping Sheet?
-
Is placement of concrete in each lot recorded in concrete traceability sheet?
Inspection & Testing
-
Do client-supplied products meet specified requirements?
-
Do all ITP's have inspection and test records attached? (This may include: Verification checklists, test reports, compliance certificates, weighbridge dockets, survey reports, NCR and NCR register etc)
Survey Control
-
Are all set out surveys made from control stations established by the client?
-
Are additional stations established from the original control's stations by a qualified engineering surveyor or registered surveyor?
Control of Monitoring & Measuring Devices?
-
Is the measuring equipment site register being maintained?
-
Are two-peg tests conducted prior to any critical levelling activity?
-
Are two-peg tests recorded in register?
-
Does any of the equipment require calibration?
-
If yes, which equipment requires calibration?
Service Search
-
Has information been obtained from Dial-Before-You-Dig?
-
Are related plans/information kept in site file?
-
Is a service search conducted according to procedure?
Client Satisfaction
-
Is the client satisfied with our work?
-
What has been client feedback?
-
Have there been any complaints from the Client or local community?
-
What has been the complaints from the Client or local community?
-
-
If an incident/improvement/non-conformance report was completed, was it forwarded to the client within 24 hours?
Control of Non-Conformances
-
Is the NCR Register up to date?
-
Is the project monitored for non-conformances including safety, environmental, procedures not documented properly, forms not completed as per their procedure etc
-
For NCR's, have corrective and preventative actions been identified and documented in the NCR/PAR form?
-
Have NCR's been closed out?
Improvement
-
Are there any opportunities to make construction processes or work methods or management systems more efficient or effective?
-
If yes, what opportunities?
-
Has this opportunity been documented in an incident/improvement report form?
Closing out
-
Project Manager
-
Supervisor
-
Director
-
Project Administrator