Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
All Property Solutions sites must be audited by a Project Manager at least once a month. Complete all areas of this audit and ensure that any issues have a person responsible and a date that the issue must be resolved by.
1. Working at Heights
-
1.1. Fall risks of 2m or more? (including voids, pits, and trenches)
-
1.2. Lack of edge protection?
-
1.3. Unsafe or incomplete edge protection?
2. Plant and Equipment
-
2.1. Unsafe or damaged plant/equipment? (including missing or damaged guards)
-
2.2. Incorrect plant /equipment for job? (e.g. grinding discs for cutting)
-
2.6. Lack of training in safe operation, clean-up and maintenance?
3. Scaffolds
-
3.1. Unlicensed persons erecting scaffold above 4m?
-
3.2. Unsafe or incomplete scaffold?
-
3.3. Lack of inspection protocol for scaffold?
-
3.4. Incompatible scaffold components? Unlabelled or do not meet NZS?
-
3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)
6. Ladders
-
6.1. Unsafe or damaged ladders?
-
6.2. Unsafe positioning of ladders?
-
6.3. Ladder not properly secured?
7. Hazardous Manual Tasks
-
7.1. Lack of identification and assessment of hazardous manual tasks?
-
7.3. Inadequate risk controls? (examples: no job rotation, lighter loads, trolleys, lifting equipment, etc)
-
7.4. Lack of training in risk controls and safe lifting/ team lifting techniques?
9. Emergency Response
-
9.1. Lack of, or no emergency plans for site?
-
9.4. Lack of, or inadequate first aid kits aid equipment or fire extinguisher for site?
10. Traffic Management
-
10.1. Lack of, or inadequate, Traffic Management Plan (TMP) in place?
11. Personal Protective Equipment (PPE)
-
11.1. Lack of, or inadequate PPE (including sun protection)
-
Has mandatory PPE for site been specified and signage posted?
-
11.3. Are all Sub Contractors wearing appropriate PPE?
12. Work Environment
-
12.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)
-
12.2. Insufficient lighting?
-
12.3. Inadequate housekeeping?
-
12.4. Lack of, or inadequate noise/ vibration control?
-
12.5. Are all materials stacked safely in assigned areas?
-
12.6. Have all vertical re-in forcing steel bars been capped?
13. Electrical Hazards
-
13.1. Unsafe electrical leads? (damaged, out of test date or not tested with 3 months)
-
13.2. Lack of RCD protection?
-
13.4. Contact with overhead electrical lines?
-
13.5. Overloading outlets?
-
13.7. Electrical equipment near water?
-
13.8. Electrical equipment near flammables?
14. Environmental Hazards
-
14.2. Lack of/or inadequate, dust suppression system?
-
14.3. Lack of/or inadequate systems to prevent contaminants entering stormwater drains?
15. Administrative Procedures
-
15.1. Lack of/or inadequate Site Safety Plan?
-
15.2. Evidence of a hazard identification and control procedure: up to date hazard board, task analysis?
-
15.3. Lack of, or inadequate, induction for workers, contractors, visitors?
-
15.4. Lack or, or inadequate, supervisory arrangements with staff or Sub Contractors?
-
15.6. Lack of/or inadequate Task Analysis for high- risk work?
-
15.8. Lack of/or inadequate accident/ incident notification procedures?
-
15.9. Lack of, or inadequate, routine inspections, monitoring, audits (PM - Monthly/ Foreman - weekly)?
-
15.10. Lack of/or inadequate Toolbox Talks (Weekly)?
-
15.11. All staff signing in and out of site
Property Solutions
-
16.1. Accurate job ordering in previous month?
-
16.2. Sufficient lead time for deliveries?
-
16.3. Timesheet's completed on a daily basis?
-
16.4. Clean and tidy work vehicles?
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature