Title Page
-
Client
-
Site Name
-
Conducted on
-
Prepared by
-
Location
-
Weather
Site Compound & Welfare Facilities
-
Site Compound appropriate to works being done.
-
Toilet Welfare Facility appropriate for site and kept in good order
-
Drying room adequate and with appropriate drying system
-
Canteen adequately equipped and kept clean for all
-
Site Storage area adequate for materials and kept in good safe accessible order
-
Site Housekeeping in Good Order (Clean As You Go Policy Being Adhered too)
Site Paperwork & Signage
-
Preliminary Plan on Site
-
Construction Stage Safety Plan on Site
-
AF1 & AF2 Displayed on Site
-
Safety Signage Displayed
-
Temporary Works Design Plan in Place (Where Applicable)
-
Temporary Works Sign Off Up to Date
-
Temporary Works Register on Site
-
Site signage erected and in good order
Falls from Heights
-
Scaffolding secured and fixed without risk
-
Scaffolding Design Plan
-
Scaffolding Secured and Fit for Purpose
-
Window Openings Secured with Fall Protection
-
Rooftop leading edges robustly secured
-
Stairwells Fall Protection inserted
-
Lift/Elevator Shafts Crash Deck/Fall Protection inserted
-
Ground Services Secured
-
Small Floor/Ground Openings Adequately Covered
-
Working at Heights Equipment Being Used Appropriately
-
Working at Height Equipment Safe and Fit for Purpose
Burial/Engulfment
-
Trenches adequately stepped back
-
Ground Service Openings adequately Monitored and Secured
-
Swamplands Monitored and Evaluated
-
Natural Open Ditches/Water Ways Monitored, Demarcated and Secured
-
Storm Drains Adequately Protected
-
Large Clay, Stone, Wood Stock Piles Secured and Monitored
-
Attenuation Tank Area Adequately Protected
-
Large Excavations/ Trenches Adequately Protected
Chemical/Biological
-
Adequate Measures in Place to prevent the spread of Covid-19
-
Crystalline Silica Protective Measures in Place and Being Adhered too
-
Lead Paint Protective Measures in Place and Being Adhered too
-
Asbestos Protective Measures in Place and Being Adhered too
-
Working in Confined Space Measures in Place and Being Adhered too (buddy system for Attic spaces etc)
-
Wood Dust Measures in Place and Being Adhered too
-
Aspergillosis measures in place and all guidelines being adhered too
-
Site dust containment measures in place and being adhered too
-
All Chemicals Secured in Bunds
Assembly/Dismantling of Heavy Prefabricated Components
-
Staircases Adequately Assembled and Inserted
-
RSJ’s Adequately Assembled and Inserted
-
Roof Trusses Adequately Assemble and Inserted to Plan
-
Prefabricated Concrete Floors/Walls Inserted to Plan
-
Robust Safe Plan of Action for the Demolition of Wall/Roof/Floor/Ceilings
-
All Works Being Carried out in Accordance to SPA/CoP
-
Props being used for Large Prefabricated Materials being Erected on Site
Working in Proximity of Live Services
-
Overhead Power lines Adequately demarcated & Goal Posts in Place
-
Underground Live Electrical Services Mapped
-
Internal Live Electrical Wiring Identified
-
Internal Live Electrical Wiring Isolation Tagout/Lockout System in Place
-
Working in Proximity to Live Gas Services Adequately & Safely Managed
-
Working in Proximity to Foul Services Adequately & Safely Managed
-
Working On or Near Pressurised Water Mains Adequately & Safely Managed
Adjacent Lands & Boundary
-
Adequate Site Fencing (Herras Fence/Wood/Metal Hoarding)
-
Site Boundary Fencing Secured & Monitored
-
Public & Site Pedestrian Management Plan in Place
-
Traffic Management Plan in Place and being used as proposed
-
All Neighbouring Lands Being Monitored
-
Neighbouring Lands Secured
Temporary Works
-
Scaffolding Design Plan
-
Civil Works Design Plan
-
Form Works Design Plan
-
Crane Base
-
Floor Props, False Works Platforms
-
One Off and/or Large Site Specific Signage
-
Sheet Piling/Ground Beam Bracing/Structure Bracing
-
Structure Support Scaffolding