Title Page

  • Project Name

  • Location
  • Witnessed by

  • Conducted on

Pump Commissioning Checklist

Pump Commissioning

  • Is the completion of equipment installation in all respect as per respective drawings/documents?

  • Are bearings and hydraulic coupling lubricated with specified lubricant?

  • Are the couplings between in perfect alignment?

  • Are coupling bolts and guard installed?

  • Is the rotor free in its bearings?

  • Is the pump/engine rotating direction correctly? (The orientation of the pump must match the arrow.)

  • Are instrumentation and protection devices checked by simulation? Are measuring and monitoring instruments okay?

  • Is the Oil Flushing of Oil Circuit over successfully? Is new oil filled in the hydraulic coupling and oil circuit?

  • Is the reverse rotation detection switch on hydraulic coupling and protection okay?

  • Are holding-down bolts fitted securely?

  • Are leakage lines for drain, wind, and gland directed correctly to prevalent drains?

  • Are the automatic recirculation valves and back pressure valve correctly fitted in the recirculation line?

  • Are oil coolers, oil pipes, and cooling water pipelines installed properly as per Piping and Instrumentation Diagram (P&ID) and General Arrangement (GA)?

  • Are mechanical seals checked?

  • Are the Discharge Valves of Pumps kept closed?

  • Are Line Vents kept opened?

Completion

  • Additional Comments

  • Witnessed by:

  • Installer Name & Signature

  • Contractor Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.