Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Installer
Job Site Conditions
-
Site free of obstructions
-
Does the site have roof skylights
-
Site free of slip/trip hazards
-
Site openings covered or barricaded
-
Have the panels been placed/laid on roof
JSEA, SWMS and Work Permit
-
Permits required
-
Contractor can access SWMS
-
JSEA is accurately completed and signed
-
Appropriate control measures are in place for UV exposure
-
First aid kit
-
PPE Provided is adequate
Licence/Accreditation
-
Is the CEC electrician on-site
-
Are all team members that are working at heights certified
-
Are all members in Rapid Global and compliant
Height Safety
-
Adequate fall protection in place
-
Are all people W.A.H working in Fall Restraint
-
Anchoring point suitably installed
-
Harness in good condition, in date
-
Item on roof secured from falling
Emergency Response Plan
-
Has it been communicated on site, and understood by all
Electrical
-
Portable tools properly tagged
-
Appropriate isolation methods
Protective Clothing
-
Eye protection whilst cutting
-
Hearing protection
-
Appropriate foot wear
-
Appropriate clothing being worn
Ladders
-
Are there any ladders currently in place
-
Base on firm footing
-
Correct angle 4:1 Height:Base
-
Secured against movement
-
Extended one meter above landing place
Fire Prevention
-
Extinguisher tested and tagged
Testing
-
Does the installer have appropriate commissioning test equipment
General Comments/Observation/Photos