Title Page
-
Site conducted
-
Prepared by
-
Location
Pre site
Site Preparation
-
Total Number of Survey Pegs Located (Please enter how many)
-
Number of Zero Boundary pegs Located (if Required)
-
Is a Re-survey Required
-
Are Surrounding Blocks Vacant
-
Is Silt Protection Required
-
Water Tapping on site
-
Recycled water available
-
Dos the Grass need to be mowed
-
Does the site need a site Clean (Rubbish or soil removed)
Temp/Permanent Fencing
-
Is there any Temporary fences on site
-
Is there any existing fencing Onsite (photo's & Location) i.e Rear,LHS,RHS
-
Does Fencing required to be removed
-
Are we or the Neighbours on Zero Boundary
-
Is a footing probe required (is there potential to undermine the neighbours slab/footing) Photos required
Council Assets
-
Footpath - Damage free
-
Vehicle Crossover- Damage free
-
Nature strip Damage free
-
Road Damage free
-
Kerb & Channel Damage free
-
Pit Covers Damage free
-
Number of trees - Damage free
-
Others Damage free (E.G Fire Hydrant)
-
Is Power overhead or in Ground
-
General Comments
Sign Off
-
Name
-
Signature
-
Date