Title Page
-
Conducted on
-
Prepared by
-
Location
-
Receiving Office Cleanliness: Surfaces including tops of desk and office equipment, and floor are clean and area is maintained according to posted 5S Expectation and Standard.
-
Painted Surfaces: Painted surfaces including walls, doors and yellow painted items are clean and paint is in good condition. Action plan created
-
Floor paint/markings: Floor is clear of debris and clutter
-
Moveable Items: Homes for all moveable items are clearly defined. For example, with signage or shadow boxing.
-
Lighting: Lighting is sufficient for safe operation and identification of materials. Trailer lights are all functioning.
-
Areas along walls: Areas along walls are clear of debris and any other items unless in clearly designated locations.
-
Dock Doors: Dock plates and doors are clean, operating properly
-
Signage: Existing signage is in good condition and is sufficient to identify various storage locations, safety issues
-
HVAC: HVAC is in good working order, maintains set temperature, and appears clean.
-
MRO Area: MRO Material is contained within designated area.
-
Slip/Trip Hazards: Area is free of trip/slip hazards.
-
Please correct condition immediately.
-
Computers/Printers/ Scanners & Related Wiring: Equipment is clean and appears to be operating properly. Cables/wires are well organized and secure.
-
Waste Removal: Standard Waste, Paper, Plastic/Bottle, and Compost bins are in proximity. Bins are clean and not overflowing.
-
Electrical Panels: Verify that nothing is stored on top of panels, that they are secured and in good condition, and that there is 3' of clearance.
-
Please correct condition immediately.
-
Floor: Floor appears clean and recently swept/mopped.
-
Shadow Boards: Boards are fully stocked and items are returned when not in use.
-
Outside Receiving: Empties are organized.
-
Outside Receiving: No items are on the retaining wall.
-
Outside Receiving: There are not items that don't belong in the area. (If there are, find the owner for removal). Action plan created