Title Page
-
Audit Title
-
Auditor
-
Auditee
-
Conducted on
-
Job Number
-
Site address
-
This Audit covers:
- Management Survey
- Referbishment Survey
- Demolition Survey
- Bulk Sampling and Re-inspections
- Reinspection only
- Survey Re-Survey
- BAM Basic Air monitoring
- 4 Stage Clearance
- Bulk ID
- Bulk ID Soils
-
Client
Site review
-
Age and discription of property
-
Building Type
-
Number of Bedrooms
- One
- Two
- Three
- Four
- Five
- More than Five
-
Occupied or vacant
-
Room by room assessment
Room Assessment
-
Room number (if know )
-
Room Use
- Bedroom Front right
- Bedroom Front left
- Bedroom Rear right
- Bedroom Rear left
- Landing
- Airing cupboard
- Bathroom
- Cupboard 1
- Cupboard 2
- Cupboard 3
- Cupboard 4
- Cupboard 5
- Cupboard 6
- Stairs
- Hall
- Lobby
- Lounge 1
- Lounge 2
- Kitchen
- WC
- Dining room
- Porch
- External
-
Walls
- Brick
- Plasterboard
- Timber
- Glass
- Textured Coating to wall / walls
- Insulation board Panels or Wall / walls
- Cement Panels or Wall / walls
- Other
-
Floor
- Timber / Floor boards
- Concrete
- Plasterboard
- Lathe and plaster
- Modern sealed vinyl (not suspect )
- Other
-
Ceiling
- Plasterboard
- Lathe and plaster
- Glass
- Concrete
- Cement
-
Suspect material / Materials
- Textured Coating to ceiling
- Textured Coating to wall / walls
- Cement ceiling
- Cement Panels
- IB Panels
- Vinyl flooring / Floor tiles
- Debris
- Cement pipe
- Toilet cistern
- Bath Panel
- sink pad / pads
- Bitumen adhesive
- External rainwater goods
- External felts / bitumen products
- External roof tiles
-
Photographs of suspect materials
-
Comment
Re-Survey assessment
-
Type of survey originally completed
- Bulk Sampling
- Re-inspections
- Domestic Management
- Domestic Refurbishment
- Domestic Demolition
- Commercial Management
- Commercial Refurbishment
- Commercial Demolition
- Industrial Management
- Industrial Refurbishment
- Industrial Demolition
- BAM Basic Air monitoring
- 4 Stage Clearance
-
Proportion % of areas re surveyed in relation to total site
-
Is/Was original surveyor qualified and approved to complete the type of survey undertaken?
-
Is resurvey being completed on same day of original survey?
-
Was the correct type of survey undertaken? (in relation to client’s requirements / instructions).
-
Has the site layout been sketched correctly showing all locations, all sample points and area ID marked on plans including Project No?
-
Were all reasonably accessible asbestos products sampled during this survey and a sufficient sampling strategy adopted?
-
Are the recommendations in the report appropriate to the asbestos product’s condition?
-
Were the sample location points clearly labelled? (subject to the client’s instructions).
-
Were areas of no access justified?
-
Have any areas been limited on inspection requiring a further visit?
-
Were all ACM products sampled with acceptable sampling strategies?
-
Was a reasonable negative sampling strategy adopted on site?
-
During the assessment are there any additional ACM or suspect products identified?
-
Are site notes/ Dictaphone notes accurate, and show that the survey was carried out in systematic manner?
-
Do they contain extrapolations, areas of no access?
-
Based on the findings of this assessment has the site work been completed to a suitable standard?
-
Are further site re surveys required on surveyor?
Audit report notes
-
Notes
-
Comparison with original survey information
-
Addititional Photographs or drawing
-
Drawing