Title Page
-
Scheme conducted
-
Conducted on
-
Prepared by
-
Score: Brilliant: 100%, Good 72%-99%, Inadequate: below 72%, Needs Improvement: below 20%
External & Entrance First Impressions
-
undefined
Communal & Corridors First Impressions
-
undefined
Communal Facilities First Impressions
-
undefined
Restaurant/Kitchen
-
Tables and chairs are positioned to appear presentable and welcoming
-
Tables are dressed with table tops, placemats, condiment holders etc
-
Floor is clear of debris and stains
-
Decoration is in a high level of standard with no holes, plaster damage and paint has been correctly matched in the event of walls being patched
-
Menus are in place and are at brand standard
-
Evidence of events being planned and advertised within the restaurant relating to catering
-
Premises Licence (If applicable) visible
-
Think 25 signage displayed
-
Key staff personal licence readily available
Office Notice Boards
-
TV licence (communal & concessionary)
-
Employee Insurance
-
ICO Certificate
-
Corporate Plan Strategy
-
Colleague Champion Information
-
ERP
-
OOH & On-call rota
Communal Notice Boards
-
Meet the team poster in place (correct staff members in place with photo)
-
Monthly you said we did
-
Safeguarding information
-
Lifestyle coach information - evidence of events, activity planner
-
Damp & Mould guidance
-
How to report ASB
-
How to complain
-
How to raise a repair
-
Money advice support
-
Environmental contractor sign in sheet (GM & Window cleaner)
Health & Safety
-
HSE Health & Safety Law Poster in Place
-
Up to date First Aiders & Fire Marshall register in place
-
Push to exit on fire exit doors
-
Salto software functioning correctly, staff can show how to program a door entry fob
-
CCTV in place with clear monitoring footage, are the staff aware of how to use the software
-
Battlebox in place and effectively stocked with up to date documentation including PEEP summary, ERP & fire evac plan.
-
Contractor sign in book in place and being used correctly
-
No smoking signs visible on front doors / communal
-
Fire action notices throughout scheme
-
Caution hot surface stickers visible on radiators/storage heater (if applicable)
-
In date PAT testing labels visible on plugs/electronic devices
-
GRIT bin stocked, winter contingency plan in place & relevant
-
Fire assembly point in place & visible
-
Fire panel free from faults and displaying healthy
-
Red fire box in place and is locked
-
10% spot check of fire door signage
-
10% sample of fire doors not being wedged open
-
10% check no amendments have been made to doors (communal of flat front doors)
-
Contractor insurances (hairdresser public liability etc) Licences also saved within correct shared folder
-
10% spot check on communal window restrictors
-
Random spot check of fire extinguishers
-
Visual check that no belongings are blocking fire exits
-
Complete unannounced pull cord spot check
-
Check for any evidence of fly tipping
-
Correct master key sign in/out process being complete alongside weekly master key audit.
-
Check that all BA's are being used correctly upon Northgate (ASB , SG, general)
-
Sprinkler system healthy, no faults showing on fire panel
-
Staff on site are aware where the shut off valve is (to be used in false activations only)
-
Staff have been trained on sprinklers
AOB (Staff & Customer interaction or monitoring)
-
undefined
ARM Sign Off
-
Signature