Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Works carried out under gas permit number

  • PERMIT NUMBER:

Roughin works complete

  • All Roughing works completed, including risers and Isolation. <br>

  • Reason for works not being completed

  • Type of test

Installation type

  • Is installation clearly marked on drawings, "As Built"

  • Yes

  • No

  • Sketch of localised pipe runs or location (if required)

  • Add media

  • Pressure test held for a period of no less than 30 min at at min pressure of 5psi (35 Kpa) as per code. <br>

  • Check all joints and fittings and retest

  • Gauge pressure

  • Start time of test

  • End time of test

  • This will certify that I have tested the piping installed under the above permit with air at a
    minimum pressure of 5 p.s.i./ 35 KPa gauge for a minimum of 30 min with no loss of pressure
    and that, to my knowledge, all piping, appliances and vents are installed in accordance with the
    latest edition of the CAN/CSA Gas Code and have been left in a safe condition.

  • Installer / Lead Hand

Customer sign off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.