Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Type of house
- Single story
- Double story
- Multi level
- Set of units
-
Builder
- PDA
- PDL
- PDP
- HERMITAGE
- HENLEY
- QUANTUM
- CARLISLE
- ASHFORD
- OTHER
GENERAL ITEMS
-
Drilling of Timber studs and floor joists have correct spacings
-
Check location of GPO's in all wet areas, clear of water regs and clear of cupboards
-
Check location of switches in all wet areas, clear of water regs, cupboards, showers and doors
-
Have any items been moved from the original plan position
-
Earth bond is wired in 6mm and clip/ bond sprayed with zinc
-
Conduit drops in garage have been completed
-
Have the Sub circuits feeds been put into the switch board/sub board
-
Has the job been swept on completion and all rubbish put in bin
DOUBLE STORY ITEMS
-
Range hood has been vented & ducted
-
Ex fans have been ducted or holes provided to vent air
-
Stair lights have been measured and written on plan
MEASUREMENTS ON PLAN
-
Have the No Clip measurements been recorded on the plan
-
Measurements for garage GPO's and switches written on plan
-
All sweep fans/future sweep fans and/or light point are nogged out and measurements written on plan
-
Measurements for sub board written on plan
-
Smoke detectors are measured and clearly marked on plan
-
Ex fans and lights in hard to reach locations have been measured and written on plan
OUTSIDE
-
All outside items are at correct heights to plan
-
Are all weatherproof items a min of 100mm clear from downpipes
-
Is the phone line a min of 500mm from the gas meter position
-
Are all electrical items a min of 1000mm from gas meter position
-
Is all L&O rubbish in the bin
OTHER TRADES
-
Brickwork
- Not started
- Onsite/ have started
- Not on site/ have started
- complete
-
Heating and Air con
-
Has the light and power been fit off
-
Argus
- Argus work not required
- Argus work not done
- complete
- Currently onsite
-
Insulation installed
PAPERWORK
-
Has the site establishment checklist been completed for this job
-
Has an unfinished job report been handed in
-
Does the supervisor need to be notified of any changes
-
Other notes:
-
Media relating to notes: