Title Page
-
Site conducted
-
Daily Report Date
-
Daily Report Document #
-
Prepared by
-
Site Name
-
Mapped Location
Weather/Site Conditions
-
General Weather
- Sunny - Clear Skies
- Partially Cloudy
- Overcast
- Partial Rain
- Thunderstorms
- All Day Rain
- Snow/Sleet
undefined
-
Temperature
Safety Review
-
Safety Tool Box Talk
- PPE
- Slip/Trip/Fall
- Working from Heights
- Traffic Control on Site
- Emergency Evacuation
- Electrical
- Heat/Cold Stress
- Handling/Storage of Materials/Equipment
- Chemicals
- Hygene
- Hand Tools
- Specific Equipment
- Stand Down
-
PPE Discussed
-
By Whom and Reason
-
Safety High Risk Activities Identified for Today's Scope
-
Safety Risk Desription
-
AHA Provided and Reviewed with Team
-
Safety Impact to Schedule, Scope or Cost
- Schedule
- Scope
- Cost
- None
-
# of Days
-
Recovery Plan in Place
-
Describe Impact to Scope
-
Workaround
-
Describe Workaround
Housekeeping Review
-
COVID 19 - Questionnaire/Temperature Check
- Yes
- No
- N/A
-
All Passed
-
The Following Individual(s) did NOT PASS
-
Temperature
-
Sent Away from Site
-
Further Actions/Documentation
-
Describe Action/Documentation
-
Remind Subcontractor to take allowable before and after photos, especially if existing area or items damaged
-
ABM and Subcontractor Rep. to walk work area
-
Remind Subcontractor of Good Housekeeping
-
Identify areas to access
-
Reminder of the importance of final cleanup
-
Was smoke alarm disabled prior to work starting
-
Photos of Existing Conditions if Damage to Finishes (Walls, Floor, Ceiling) , Equipment, Furnishings
-
If Existing Conditions Damaged - Describe
-
Area and Description
Mechanical/Electrical and Controls Today and Upcoming
-
Subcontractor
-
UPCOMING MECHANICAL/CONTROLS ACTIVITIES - to include installation of equipment and controls that impact daily operations of equipment
Rocks in the Road
-
Rocks in the Road Considerations
-
Schedule
-
Scope
-
Other
Materials Delivered to Site
-
Deliveries
-
Item 1
-
Item 2
-
Add media
Inspection/Testing
- Type of Inspection/Testing
-
Inspection
- Chiller(s)
- Boiler(s)
- VAVs
- AHU
- Other
- Not Applicable
-
Factory Start Up
-
Type of Factory Start Up
- Chiller System
- Boiler System
- HVAC System (Identify AHU)
- VAV (identify (Identify area)
- Other
-
Pre-Functional Test
- Chiller System
- Boiler System
- HVAC System (Identify AHU)
- VAV (identify (Identify area)
- Other
-
Superintendent Validation (Sub shows ABM System Functions as Designed)
-
Documentation Received
-
Submitted to Commissioning Lead
-
Date PFT to be Received
-
Functional Testing - Commissioning
- Chiller System
- Boiler System
- HVAC System (Identify AHU)
- VAV (identify (Identify area)
- Other
-
In attendence
-
Other Inspection/Testing
-
Type of Testing
-
Results
-
Witnessing
-
Name of Rep
-
Title of Rep
-
Scope Witnessed
-
Photo of Witness Form Signed
-
Start of 30 Day Performance
-
Start Date
-
End Date
-
Trending Provided for M&V (must have 30 Days of Trending)
-
Witnessing
-
Partial Acceptance
-
Final Acceptance
Visitors to Site
-
Visitor(s) to Site Name and Company
-
Name and Company
-
Name and Company
-
Name and Company
Additional Photos
-
Add media