Information

  • Venue Name & Site Address:

  • Contact Name:

  • Site Reference Number:

  • Walk Off by:

  • Date of Visit:

Network Cabling Installed

  • PSTN Number:

  • BT Smart Hub (Router) Location:

  • BT Smart Hub (Router) Photo

  • Number of AP's Installed?

  • AP1 Location

  • AP1

  • AP1 Speed Test Result

  • AP1 Data Cabling length (m)

  • AP1 MAC Address

  • AP1 Serial Number

  • AP1 Serial Number & MAC Address (Rear of AP)

  • Additional AP

  • AP2 Location

  • AP2

  • AP2 Speed Test Result

  • AP2 Data Cabling length (m)

  • AP2 MAC Address

  • AP2 Serial Number

  • AP2 Serial Number & MAC Address (Rear of AP)

  • Additional AP

  • AP3 Location

  • AP3

  • AP3 Speed Test Result

  • AP3 Data Cabling length (m)

  • AP3 MAC Address

  • AP3 Serial Number

  • AP3 Serial Number & MAC Address (Rear of AP)

  • RJ45 Boots installed on Data cabling

  • NEW EE 4G Hub Connected?

  • NEW EE 4G Hub photograph

  • New Shelf installed

  • Photograph of Shelf and Equipment

  • Reason for not installing new shelf / Location of Equipment

  • Photo of Equipment

  • NEW 6 Way PDU (power distribution unit) Installed

  • Photo

  • NEW Switch Installed

  • Photo

  • NEW POE's Installed

  • NEW POE's Installed (Photos)

  • NEW Patch cables installed

  • NEW Do Not Turn off Stickers installed on 6 way Mains plug

  • Photo

  • All Cabling Neat and Tidy

  • Any Additional Materials/ Equipment Supplied i.e Trunking etc

  • Any Additional Materials/ Equipment Supplied i.e Trunking etc

  • If Plastic Trunking has been installed - cabling all supported with metal fixings

  • Photo (sections before lid replaced)

Snagging

  • Any outstanding issues / snagging

  • Please outline and provide details

  • Photos of outstanding remdial work

  • Generic system design if different from standard spec?

  • Provide details

  • Photographs

System Design

  • Generic System Design

    Costa Coffee.JPG
  • Any additional photographs

  • Please provide photo of venue splash page

  • Please provide photo of hub management page showing renamed AP's

Sign Off

Sign Off

  • Customer Name

  • Customer Job Title

  • Date

  • Is the customer happy to score the work?

  • Please rate the work (1 = Poor, 3 = Average, 5 = Excellent)

  • SCCI Engineer

  • Completed Sign Off

  • SCCI Clearcode (please obtain a clearcode via Tesseract and the SCCI NSG Helpdesk)

  • Time left home/office

  • Time arrived on site

  • Time completed on site

  • Time arrived at Home/Office

  • Please email the completed report to venue.wi-fi@bt.com and btwifi@sccialphatrack.co.uk

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.