Title Page
-
Site conducted
-
Document No. GYP 003 v1.0
-
Client / Site
-
Audit Title
-
Block/Plot NO
-
Conducted on
-
Prepared by
-
Site Address
-
Method statement agreed with client.
-
All latest construction specification received ,read & understood and screed received in accordance to the QA Delivery Sheet.
-
Working area secured by providing no entry/work in progress signs.
-
Type of screed Application checked.
-
Substrate floor fully cleaned of loose material and swept.<br>
-
Is screed thickness as per drawings?
-
Screed level checked against given datum and within tolerances.
-
Is 1m FFL/screed level installed by MC?
-
Damp Proof Membrane/Gas Membrane installed over substrate floor (if specified as required) and gas pipes mush and checked against specifications (Vented).
-
Insulation Perimeter Strips/Upstands are installed, all joints to are taped and sealed to prevent screed getting into gaps b/w boards.
-
Polythene Membrane installed over insulation surface (if specified as required).
-
10mm yelofon installed as per manufacturers recommendations?
-
Insulation/Resilient layer laid on area to be screeded, all joints to are taped and sealed to prevent screed getting into gaps b/w boards.
-
Is perimeter up stands installed correctly?
-
Is SVP pipes and duct work warped with yelofon?
-
Area watertight from above.
-
Screed surface sanded to remove surface laitance (if applicable) 48hrs-7days Max.
-
Plot left clear and clean, surplus removed.
-