Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Enter date by selecting date and time from counter

  • Choose shift inspection performed on

  • Enter Crew conducting inspection

Active Mining Area

  • Area Name

  • Floor Level

  • Is the floor at the correct RL (+\- 200mm) and has the RL been checked?

  • Are ramps on grade?

  • Has a laser been set up?

  • Lighting

  • Is sufficient lighting in place and correctly positioned?

  • Wall Control

  • Are batters on design and have they been checked?

  • Efficiency

  • Is there oversize material, toe or any other issue contributing to loss of productivity at the active loading area?

  • Ancillary Interaction

  • Are ancillary activities significantly affecting the load and haul operations?

  • Tyre Damage

  • Is the area free from spillage?

  • Is the bench setup to minimise trucks reversing up to the face?

  • Ore Mark Outs

  • Are all boundaries appropriately marked out?

  • Dewatering

  • Are the pumps set up in the correct areas and running?

  • Is the floor dry?

Active waste dumps

  • Enter Dump Name

  • Stability

  • Are there any signs of cracks or slumping?

  • Are there any signs of the dump face bulging, material flowing out or face undermined?

  • Windrows

  • Are windrows constructed to the correct height and the integrity for the competency of the material?

  • Roadway

  • Are the spine roads clearly defined and delineated?

  • Is the roadway in good condition?

  • Drainage

  • Is adequate drainage in place to ensure no ponding occurs at the tip head?

  • Tip head

  • Is the tip head square with a 3% incline to the toe of the windrow?

  • Does the area directly below the tip head have a physical barrier in place (no active faces)?

  • Lighting

  • Is sufficient lighting in place and correctly positioned?

  • Dump Level

  • Is the dump being constructed to the correct level and have level checks been performed?

  • Dump set up

  • Are the "T" pieces and corner loads in place and positioned correctly?

Active Ore Dumps

  • Active ore dumps

  • Quality Control

  • Is the material dumped at the correct location?

  • Are stockpiles adequately signed?

  • Stability

  • Are there any signs of cracks or slumping?

  • Are there any signs of the dump face bulging, material flowing out or face undermined?

  • Windrows

  • Are windrows constructed 1.6m high with sufficient integrity?

  • Roadway

  • Is the road in good condition?

  • Drainage

  • Is adequate drainage in place to ensure no pounding occurs at the tip head ?

  • Tip head

  • Is the tip head square with a 3% incline to the tow of the windrow?

  • Does the area directly below have a physical barrier in place (no active faces)?

  • Lighting

  • Is sufficient lighting in place and correctly positioned?

  • Ore reclaim

  • Has the dump entrance been blocked with a physical barrier?

  • Dump setup

  • Are the "T" pieces in place and positioned correctly ?

Active Haul Roads

  • Enter road name

  • Road Width

  • Are the road widths acceptable (double lane - 23m, single lane - 15m, wider on corners)?

  • Road Gradient

  • Are all ramps maintained at a 1:10 gradient?

  • Super Elevation

  • Are the corners appropriately super elevated (+ve super)?

  • Road Condition

  • Is the surface in good condition (e.g. No soft spots/ rutting/ corrugations , not slippery)?

  • Cutting Corners

  • Is there evidence of trucks cutting corners?

  • Spillage

  • Is the roadway free of spillage and are operators calling up to report spillage?

  • Windrows

  • Are windrows along the road edges constructed to standard (min 1.6m high, good integrity, high hazard bunds in place where required)?

  • Have grader windrows been removed from the sides of haul roads (not creating ramps at the base of windrow toes)?

  • Delineation

  • Are the roadways adequately delineated (max 50m spacing, red reflector on left, white on right)?

  • Signage

  • Is adequate signage in place to control traffic flow (minimise interruption to haulage traffic, control of intersections)?

  • Dust

  • Is road watering being conducted appropriately to minimise dust without over watering?

General

  • Enter area name

  • Parking

  • Are all light vehicles parked fundamentally stable in an area outside of haul truck flow?

  • Are all heavy vehicles parked fundamentally stable (trucks in "V" drains)?

  • Lighting Plant Bunds

  • In active hauling areas, are lighting plants located in bunds that are facing away from traffic and 1.6m high?

  • Geotechnical

  • Are adequate controls in place to control known geotechnical hazards?

  • New work areas

  • Are new work areas being prepared prior to relocating equipment?

  • Hauling efficiency

  • Is there an opportunity to improve haulage efficiency (issues/ obstacles that are impeding the haulage cycle)?

  • Positive Communications

  • Where applicable are positive comms being used at all times?

  • Drill and blast

  • Are all drill and blast areas demarcated and signed?

  • Enter name of supervisor and sign

  • Enter name of mining superintendent and sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.