Check List
1.1) PJRA been completed and all appropriate controls in place.
1.2) The unit is clean
1.3) Has bin been modified from original design?
Service tech's initals
2.1) Bin's walls are free of holes, gouges, cracks or broken welds
2.2) Bin's flooring is free of holes, gouges, cracks or broken welds or strips
2.3) Bin's insides free of any obstructions which could hinder operations in the field? (i.e. loader/back hoe emptying)
2.4) Walls and floor inspection & service verified completed
3.1) Bin's loading skid is free of holes, gouges, cracks, broken welds, bent or twisted structure
3.2) Bin's loading apparatus' (rolls, ears, plating, etc.) are in proper working order and free of any damage that may prevent proper loading
3.3) Support and loading structure inspection & service verified completed
4.1) All fittings (valves, unions, cam locks, flanges, etc. if applicable) are functioning correctly or have been properly plugged/capped off.
4.2) All drainage ports tread has been cleaned, is not misshapen or egged and is installed as to allow proper draining of bin
4.3) All drainage plugs are in proper working order and have proper securement attaching it to the bin.
4.4) Any installed tie downs meet all regulatory requirements and are free of twisting, stretching, broken welds or any other damage that may compromise their use as tie downs
4.5) Fittings, drainage and tie downs inspection & service verified completed
5.1) Unit number welded onto unit , is correct and legible
5.2) Paint meets BOS color specifications and represents BOS' image appropriately (No peeling or chipping paint, rusting or missing sections, consistent color)
5.3) Decal matches equipment's decal procedure, all decals are in good conditions and represents BOS' image appropriately
5.3) Pain and decal inspection & service verified completed
Have supervisor complete below listed final inspection and final sign off.
6.1) Unit is clean
6.2) Decals and paint meet BOS standards and current decal procedures
6.3) All fittings required fittings (if applicable) are present and in operable condition
6.4) All cam locks (if applicable) are plugged and has double securement in place
6.5) All threaded drain plugs are installed and secured to unit by chain or other approved securement
6.6) Unit is ready to ship to field