Check List
1. Pre-inspection / Service
-
1.1) PJRA been completed and all appropriate controls in place.
-
1.2) The unit is clean
-
1.3) Has bin been modified from original design?
-
Modification Summary:
-
Service tech's initals
2. Walls and floor
-
2.1) Bin's walls are free of holes, gouges, cracks or broken welds
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
2.2) Bin's flooring is free of holes, gouges, cracks or broken welds or strips
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
2.3) Bin's insides free of any obstructions which could hinder operations in the field? (i.e. loader/back hoe emptying)
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
2.4) Walls and floor inspection & service verified completed
-
Verifying tech sign off
3. Support and Loading Structure
-
3.1) Bin's loading skid is free of holes, gouges, cracks, broken welds, bent or twisted structure
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
3.2) Bin's loading apparatus' (rolls, ears, plating, etc.) are in proper working order and free of any damage that may prevent proper loading
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
3.3) Support and loading structure inspection & service verified completed
-
Verifying tech sign off
4. Fittings, Drainage and Tie Downs
-
4.1) All fittings (valves, unions, cam locks, flanges, etc. if applicable) are functioning correctly or have been properly plugged/capped off.
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
4.2) All drainage ports tread has been cleaned, is not misshapen or egged and is installed as to allow proper draining of bin
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
4.3) All drainage plugs are in proper working order and have proper securement attaching it to the bin.
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
4.4) Any installed tie downs meet all regulatory requirements and are free of twisting, stretching, broken welds or any other damage that may compromise their use as tie downs
-
Damage Summary:
-
Damage repaired
-
Tech initials verified repairs completed
-
4.5) Fittings, drainage and tie downs inspection & service verified completed
-
Verifying tech sign off
5. Paint and Decals
-
5.1) Unit number welded onto unit , is correct and legible
-
5.2) Paint meets BOS color specifications and represents BOS' image appropriately (No peeling or chipping paint, rusting or missing sections, consistent color)
-
5.3) Decal matches equipment's decal procedure, all decals are in good conditions and represents BOS' image appropriately
-
5.3) Pain and decal inspection & service verified completed
-
Verifying tech sign off
6. Supervisor Final Inspection
-
Have supervisor complete below listed final inspection and final sign off.
-
6.1) Unit is clean
-
6.2) Decals and paint meet BOS standards and current decal procedures
-
6.3) All fittings required fittings (if applicable) are present and in operable condition
-
6.4) All cam locks (if applicable) are plugged and has double securement in place
-
6.5) All threaded drain plugs are installed and secured to unit by chain or other approved securement
-
6.6) Unit is ready to ship to field
-
6.7) Take pictures of all 4 of the ready unit's sides.
-
6.8) Supervisors signature