Check List

1. Pre-inspection / Service

  • 1.1) PJRA been completed and all appropriate controls in place.

  • 1.2) The unit is clean

  • 1.3) Has bin been modified from original design?

  • Modification Summary:

  • Service tech's initals

2. Walls and floor

  • 2.1) Bin's walls are free of holes, gouges, cracks or broken welds

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 2.2) Bin's flooring is free of holes, gouges, cracks or broken welds or strips

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 2.3) Bin's insides free of any obstructions which could hinder operations in the field? (i.e. loader/back hoe emptying)

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 2.4) Walls and floor inspection & service verified completed

  • Verifying tech sign off

3. Support and Loading Structure

  • 3.1) Bin's loading skid is free of holes, gouges, cracks, broken welds, bent or twisted structure

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 3.2) Bin's loading apparatus' (rolls, ears, plating, etc.) are in proper working order and free of any damage that may prevent proper loading

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 3.3) Support and loading structure inspection & service verified completed

  • Verifying tech sign off

4. Fittings, Drainage and Tie Downs

  • 4.1) All fittings (valves, unions, cam locks, flanges, etc. if applicable) are functioning correctly or have been properly plugged/capped off.

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 4.2) All drainage ports tread has been cleaned, is not misshapen or egged and is installed as to allow proper draining of bin

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 4.3) All drainage plugs are in proper working order and have proper securement attaching it to the bin.

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 4.4) Any installed tie downs meet all regulatory requirements and are free of twisting, stretching, broken welds or any other damage that may compromise their use as tie downs

  • Damage Summary:

  • Damage repaired

  • Tech initials verified repairs completed

  • 4.5) Fittings, drainage and tie downs inspection & service verified completed

  • Verifying tech sign off

5. Paint and Decals

  • 5.1) Unit number welded onto unit , is correct and legible

  • 5.2) Paint meets BOS color specifications and represents BOS' image appropriately (No peeling or chipping paint, rusting or missing sections, consistent color)

  • 5.3) Decal matches equipment's decal procedure, all decals are in good conditions and represents BOS' image appropriately

  • 5.3) Pain and decal inspection & service verified completed

  • Verifying tech sign off

6. Supervisor Final Inspection

  • Have supervisor complete below listed final inspection and final sign off.

  • 6.1) Unit is clean

  • 6.2) Decals and paint meet BOS standards and current decal procedures

  • 6.3) All fittings required fittings (if applicable) are present and in operable condition

  • 6.4) All cam locks (if applicable) are plugged and has double securement in place

  • 6.5) All threaded drain plugs are installed and secured to unit by chain or other approved securement

  • 6.6) Unit is ready to ship to field

  • 6.7) Take pictures of all 4 of the ready unit's sides.

  • 6.8) Supervisors signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.