Information

  • FFP name:

  • Conducted on

  • Prepared by

Civil

  • Have all Civil NCRs been remedied on site?

  • Has evidence of the NCRs been provided to the VPL UFB Quality Mailbox?

  • Has all reinstatement been completed? If not, please provide full details below.

  • Has all documentation, including the Pole to Boundary Data Sheet, NDF13042 and NDF245 been loaded to Viscore and checked by yourself to ensure correct?

  • Which of the Asbuilts below are loaded to Viscore and checked for accuracy?

Aerial Slinging

  • Does this site meet RMA requirements - IE is all cable between 150mm and 600mm of the LV?

  • Have all Aerial Slinging NCRs been rectified on site?

  • Has evidence been provided to the VPL UFB Quality Mailbox?

Fibre Jointing

  • Have all Fibre Jointing NCRs been rectified on site?

  • Has evidence been provided to the VPL UFB Quality Mailbox?

  • Which of the Asbuilts below are loaded to Viscore and checked for accuracy?

  • Has the ONT testing been completed and the Splitters installed into every FFP?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.