Title Page
-
Customer Name
-
Postcode
-
Conducted on
-
Prepared by
-
Location
Roof Works
Photo's Pre-Installation
-
Pictures of all roofs before you start
-
Are there any existing damages on the roof
-
Take photo of existing damages
-
Pictures of scaffolding and scaffolding tag
-
Photo with tape measure of the EXPOSED width of the roof tile
-
Example photo
-
Photo with tape measure of the EXPOSED height of the roof tile
-
Example photo
Photos DURING Installation target roof one
-
Pictures of roofs hooked and railed
-
Pictures of rafters
-
Picture(s) of DC cable point entry
Photos Post-Installation
-
Pictures of edges of all panel arrays
-
Example photo
-
Pictures of complete arrays
-
Pictures underneath panels showing cables are secure
-
Does the job have bird netting?
-
Pictures of Bird Protection
-
Is they a jumper cables between panel arrays
-
Pictures of all jumper cables
-
Add media
-
Does the system have an optimizer(s)?
-
Take a picture of all Optimizer serial numbers and make a note of where they are in a array (must draw a picture)
-
Example photo of optimizer layout - (Instead of numbers I need serial numbers of the optimizer to the corresponding panel)
-
Were they any damages
-
Notes of any damages and how they were repaired
-
Photo(s) of solar array(s) taken from ground - if visible from the ground
Declarations and Proof
-
I confirm I have visually inspected the DC cables including exit to panels through roof tiles and confirm there are no damages? (other than minor superficial scratches)
-
I confirm I have visually inspected the roof, panels and cables for damage and mechanical/UV protection?
-
I confirm there are no cables or connectors resting on roof tiles and all are properly fixed to structures in accordance to the manufacturers?
-
I confirm any damages incurred during installation have been rectified
-
I confirm the roof is water tight and there are no leaks or potential entries for water ingress - post installation
-
I confirm all mess made during install has been cleaned and the site has bee left in a safe state (take a pic of site post installation)
-
Have you left the ladder guard on the ladder when leaving site to ensure no-one can access the scaffolding ?
Customer sign off
-
I confirm this installation has been installed within MCS guidelines and the customer is happy and content with installation
-
Customer signature - confirming their are happy with installation