Title Page
-
Site conducted
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Partners - Petrol Filling Station
-
Interceptor Gullies are clear, and all defects have been reported.
-
Warning signage is displayed on all stanchion and vent pipes.
-
The telephone, alarm and ullage printer in the Driver Controlled Delivery cabinet are operational.
-
Fire trolleys are located away from the Hazard Zone. There are sufficient fire extinguishers and sand buckets with lids, and there is a CO2 extinguisher in the Kiosk. All have been serviced in the past 13 months and indicate operational.
-
The fuel prices on the gantry match the prices displayed at the pumps.
-
All colleagues are able to locate the Emergency Pump Isolation Button and one is clearly labelled at each Checkout.
-
The Veeder Root system is free from any critical alarms that have not been reported.
-
The Emergency Procedure document is displayed in a colleague area or main office.
-
The Interceptor Cleaning Certificate or Job Sheet is filed and up to date.
-
The Electrical Test Certificate is filed in the Site Register and is dated within the last 12 months.
-
An up to date Vapour Recovery Authorisation Permit and Stage 1B and Stage 2 Vapour Recovery Compliance Certificates are filed in the Site Register.
-
There is a Petroleum Storage Certificate filed in the Site Register.
-
A completed DSEAR Risk Assessment is filed in the Site Register and is dated within the last three years.
-
All colleagues have completed the required training module -‘Welcome to Petrol Filling Station’.
-
All Store Managers and Shift Leaders have completed the required training module -‘Welcome to Petrol Filling Station’ and Store Manager /Shift Leader Convenience Fuel Validation.
-
The PFS store desk phone and PFS Duty Emergency phone are operational.