Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
- Anthony Kearney
- Dorin Neacsu
- Gary Logue
- Jack Lynch
- Ciara Curtin
- Mark McConnell
- Tony Carolan
- Stephen Cooney
- Edel McGoey
- Alan Mullins
- Ryan Hogg
- Emma Sorohan
- Eamon Molloy
-
Location
-
Personnel / Site Manager / Subcontractor Representative
General Site Safety
Documentation
-
Is the Safety Statement in date and signed by operatives on site and Director of company.
-
Is there a Risk Assessment & Method Statement (RAMS) in place and signed by all operatives.
-
Has a Safe Start been completed and signed by all operatives.
-
Have all operatives been inducted.
-
Is there training records available for inspection.
Housekeeping / Fire
-
Is the work area clean and tidy? Are walkways are clear of obstructions.
-
Is housekeeping of a good standard / work areas tidy.
-
Materials are stacked and stored in an orderly manner.
-
Is there sufficient skips or waste management procedures in place.
-
Adequate amount and inspected fire extinguishers available.
Electrical
-
Is lighting adequate.
-
If power tools are in use, are they in good condition.
-
Power leads & plug tops in good condition.
-
All leads are fully uncoiled.
-
If battery tools are in use, are they in good condition.
-
Have the electrical items been PAT Tested.
Work at Height
-
Is there any working at height equipment being used at time of audit.
-
Please select the type equipment in use.
- Podium Ladder
- A Frame Ladder
- Straight Ladder
- Mobile Access Tower
- Scaffolding
- Hop-Up
- Stilts
- Pop-Ups
- MEWPS / Cherry Picker / Boom Lift
- None in Use
-
Is all work at height equipment being used properly and in a safe manner.
-
Was there a harness / lanyard / inertia reel in use.
-
Was harness / lanyard / inertia reel used in the correct manner and secured to a designated anchor point.
-
Are GA3 inspections up to date for all work at height equipment.
Lifting Equipment
-
Is there any plant / machinery in use.
-
GA1's for certified plant and lifting equipment including chains, slings, hooks etc. available on site and in date.
-
Please detail the items of plant in use by the subcontractor on site.
-
GA2 Statutory Inspections up to date for all plant and lifting equipment.
-
Operated by trained personnel? CSCS Training tickets recorded on site.
-
Plant / lifting equipment up to standard / undamaged.
-
Is the SWL clearly displayed on the Plant.
-
No loads being lifted over persons at work, passing members of the public or site operatives.
-
Exclusion zones in operation and certified Banksman available for coordinating lifts and vehicle movement.
PPE
-
Please select the PPE required on site
- Safety Glasses
- Safety Hat
- Safety Footwear
- Hi-vis Vest
- Safety Gloves
- Ear Defenders
-
Is additional appropriate PPE being used for certain tasks? ie: face mask, ear protection, tasks specific gloves etc.
-
Was PPE compliance being followed on site? If not, please give details if required.
Overview
-
Condition of access routes - Are all access routes including site roadways passable, no obstructions or obvious trip hazards. (Main Contractor)
-
Please comment on the condition of welfare facilities.
-
Is there any works which exposes staff to opes or potential leading edges.
-
Is there any suggestions that could be made to improve safety on the site.
-
Please detail the work on going on site.
-
Please detail any positive behaviours or good compliance observed on site.