Title Page
-
Daily Inspection Checklist Report for month:
-
Doc No. T2-ELEC-F01
-
Site:
-
Conducted on
-
Prepared by
-
Location:
-
Personnel
Wednesday Select Team
Wednesday: Daily Inspection Checklist
Location: Basement 2
-
Team A/B/C:
Basement 2
BASEMENT 2
Loading Bay A
-
Time
-
1) Fluorescent lights
-
2) Flow sign
-
3) CDM-TD light
-
4) Power point
-
5) Exit light
-
REMARKS:
Loading Bay B
-
Time
-
6) Fluorescent lights
-
7) Flow sign
-
8) CDM-TD light
-
9) Power point
-
10) Exit light
-
REMARKS:
Loading Bay C
-
Time
-
11) Fluorescent lights
-
12) Flow sign
-
13) CDM-TD light
-
14) Power point
-
15) Exit light
-
REMARKS:
Bus Bay
-
Time
-
16) Fluorescent lights
-
17) Flow sign
-
18) CDM-TD light
-
19) Exit light
-
20) Clock (+/- 2min)
-
21) Power point
-
REMARKS:
Basement 2 Main Building North to South
-
Time
-
22) Fluorescent lights
-
23) Flow / Standing sign
-
24) Exit light
-
25) Downlight
-
26) Telephone Booths
-
27) Power point
-
28) Clock (+/- 2min)
-
REMARKS:
NTUC Area
-
Time
-
29) Fluorescent lights
-
30) Flow / Standing sign
-
31) Exit light
-
32) Downlight
-
33) LED light
-
34) Power Point
-
REMARKS:
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):