Title Page
-
Daily Inspection Checklist Report for month:
-
Doc No. T2-ELEC-F01
-
Site:
-
Conducted on
-
Prepared by
-
Location:
-
Personnel
Select Team
Saturday: Weekly Inspection Checklist
Location: Level 1 Apron & Baggage
-
Team A/B/C:
Level 1 Apron & Baggage
Level 1 Apron North
-
Time
-
1) CDM-T light
-
2) Fluorescent lights
-
3) Bay indicator sign
-
4) Exit light
-
REMARKS:
Level 1 Apron South
-
Time
-
5) CDM-T light
-
6) Fluorescent lights
-
7) Bay indicator sign
-
8) Exit light
-
REMARKS:
Baggage North
-
Time
-
9) Fluorescent lights
-
10) Clock (+/- 2min)
-
11) Power Point
-
12) Exit light
Baggage South
-
Time
-
13) Fluorescent lights
-
14) Clock (+/- 2min)
-
15) Power Point
-
16) Exit light
Toilets
-
Time
-
17) Fluorescent lights
-
18) Toilet light
-
19) CDM-R light
South- south pier
-
Time
-
20) Fluorescent lights
-
21) CDM-TD light
-
22) Exit light
-
23) Bay Indicator Sign
-
REMARKS:
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):