Title Page
-
Daily Inspection Checklist Report for month:
-
Doc No. T2-ELEC-F01
-
Site:
-
Conducted on
-
Prepared by
-
Location:
-
Personnel
Select Team
Tuesday: Daily Inspection Checklist
Location: Level 3
-
Team A/B/C:
Location: Level 4
-
Team A/B/C:
Level 3
LEVEL 3 TRANSIT
Level 3 Transit North
-
Time
-
1) CDM-T light
-
2) PLC light
-
3) Sign Board
-
4) Telephone Light
-
5) Clock (+/- 2min)
-
6) Power point
-
7) Exit light
-
REMARKS:
Level 3 Transit South
-
Time
-
8) CDM-T light
-
9) PLC light
-
10) Sign Board
-
11) Telephone Light
-
12) Power point
-
13) Clock (+/- 2min)
-
14) Exit light
Level 3 Transit South
-
Time
-
8) Flow sign
-
9) Downlight
-
10) Fluorescent lights
-
11) Telephone Booth
-
12) Power point
-
13) Exit light
-
14) Clock (+/- 2min)
Staff Lounge
-
Time
-
15) Fluorescent lights
-
16) PLC Light
-
17) Power Point
-
18) Exit Light
-
REMARKS:
Movie Theater
-
Time
-
20) Flow Sign
-
21) PLC Light
-
22) Halogen Bulb
-
23) Exit light
-
24) Clock (+/- 2min)
-
25) Power Point
Toilets
-
Time
-
26) Fluorescent lights
-
27) Toilet light
-
28) CDM-R light
-
REMARKS:
Butterfly Garden
-
Time
-
29) Fluorescent lights
-
30) Flow Sign
-
31) Exit light
-
32) Staircase light
-
33) LED light
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):
Level 4
LEVEL 4 PUBLIC
Level 4 North
-
Time
-
1) Daylight
-
2) Power point
-
3) Clock (+/- 2min)
-
4) Flow sign
-
5) FITV
-
6) Exit light
-
REMARKS:
Level 4 South
-
Time
-
7) Daylight
-
8) Power point
-
9) FITV
-
10) Clock (+/- 2min)
-
11) Flow sign
-
12) Exit light
-
REMARKS:
Toilets
-
Time
-
13) Fluorescent lights
-
14) Toilet light
-
15) CDM-R light
-
REMARKS:
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):