Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Fire tape
-
Has fire tape been installed and correctly applied
-
Are all penetrations correctly jointed or fire mastic applied
First coat and tape
-
Has first coat and tape been correctly applied.
Second coat joint
-
Has second coat been correctly applied.
Final coat
-
Has final coat been correctly applied.
Beads and trims
-
Have all beads and trims been correctly bedded and applied and are they level and plumb.
Sanding and top coat
-
Have all areas been correctly sanded and top coated ready for final snag.
Snags, please take photos to identify snags
-
Snags as per area and photos
Final check
-
Have all snags been done, all top coating and area ready for acceptance by mdl<br>
-
Once checked MDL supervisor to sign
-
Checked and accepted for client