Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Tenant name
-
Date the Tenant left the scheme
-
Date that the keys handed back to CBRE
-
Date that the lease was signed over to th
-
" Receipt of key form " completed
-
Out going head office information taken from Tenant
-
Email address and telephone number taken from Outgoing Tenant
-
Meter readings taken
-
Photos taken for the proof of final meter readings
-
Change Of Tenany form completed and sent over to OPUS
-
Unit information added the " Vacant Unit" spreadsheet for the Monthly Fire Alarm check sheet completed by the Control Room
-
Inform RAW that the Tenant has left the scheme and to remove information from the website
-
Photos taken of the Unit, on the day the keys handed back. To show level of cleanliness of the unit on exit.
-
Keys stored in control room and numbers in the cabinet
-
Are there any window vinyls that need removing
-
Are there any shop frontage signs to be removed
-
Has a letting agent board been placed on view within the unit