Information
-
Document No.
-
Energex Project Number and Audit Site
-
BCC Project Number
-
Team Leader
-
Client
-
Conducted on
-
Audited by
GENERAL REQUIREMENTS
GENERAL REQUIREMENTS
-
NOTE:- AUDITEE TO PROVIDE PHOTOGRAPHIC EVIDENCE OF DEFECT RECTIFICATION
-
Type of installation?
- Rate 2
- Rate 3
- Metered
-
Certificate of Test includes sufficient details of work and tests performed
-
This audit checks for compliance with an IMS procedure or Energex WCS?
-
IMS Procedure or Energex WCS Number?
-
Did audited task comply with the related procedure or WCS?
-
Has SIR or Rectification Notice been issued? Record number here:
-
Plan Requirements?
-
Accurate "As Constructed" plan included in returned documentation?
-
All construction changes approved in writing by the designer and marked up on plans?
-
Shallow conduit depths marked up on As Cons?
-
Earth electrode location(s) marked on plans?
STATION 1
STATION 1 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 2
STATION 2 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 3
STATION 3 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 4
STATION 4 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 5
STATION 5 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 6
STATION 6 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 7
STATION 7 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 8
STATION 8 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 9
STATION 9 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 10
STATION 10 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 11
STATION 11 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 12
STATION 12 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 13
STATION 13 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 14
STATION 14 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 15
STATION 15 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 16
STATION 16 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 17
STATION 17 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 18
STATION 18 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 19
STATION 19 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?
STATION 20
STATION 20 AUDIT
-
Record Pole No, Phase, Luminaire Height, Energised Date :-
-
Streetlight site ID correct and pole numbering complies with Network Labelling Manual?
-
Joint Use poles fitted with "2 sources of supply" labels?
-
Pit, Conduit and Cable alignments and depths correct or approved?
-
Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?
-
Correct pole / column, vertical and on correct alignment?
-
Correct luminaire installed at correct height?
-
Installation complies with PLCM, including civil work?
-
Wood grease applied to metal work penetrating timber poles
-
Electrical connections scratch-brushed and greased?
-
All IPC shear heads have separated correctly?
-
OH service cable statutory clearances maintained?
-
OH service cable sag correct (within 10%)?
-
Electrical installation in working order?
-
LV connections correct and installation electrically safe?
-
Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?
-
Test results within specified limits?
-
Relevant Certificate of Test completed and submitted? (R2 or R3)
-
Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?
-
Comments / Other?