Information

  • Document No.

  • Energex Project Number and Audit Site

  • BCC Project Number

  • Team Leader

  • Client

  • Conducted on

  • Audited by

GENERAL REQUIREMENTS

GENERAL REQUIREMENTS

  • NOTE:- AUDITEE TO PROVIDE PHOTOGRAPHIC EVIDENCE OF DEFECT RECTIFICATION

  • Type of installation?

  • Certificate of Test includes sufficient details of work and tests performed

  • This audit checks for compliance with an IMS procedure or Energex WCS?

  • IMS Procedure or Energex WCS Number?

  • Did audited task comply with the related procedure or WCS?

  • Has SIR or Rectification Notice been issued? Record number here:

  • Plan Requirements?

  • Accurate "As Constructed" plan included in returned documentation?

  • All construction changes approved in writing by the designer and marked up on plans?

  • Shallow conduit depths marked up on As Cons?

  • Earth electrode location(s) marked on plans?

STATION 1

STATION 1 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 2

STATION 2 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 3

STATION 3 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 4

STATION 4 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 5

STATION 5 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 6

STATION 6 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 7

STATION 7 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 8

STATION 8 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 9

STATION 9 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 10

STATION 10 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 11

STATION 11 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 12

STATION 12 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 13

STATION 13 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 14

STATION 14 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 15

STATION 15 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 16

STATION 16 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 17

STATION 17 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 18

STATION 18 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 19

STATION 19 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

STATION 20

STATION 20 AUDIT

  • Record Pole No, Phase, Luminaire Height, Energised Date :-

  • Streetlight site ID correct and pole numbering complies with Network Labelling Manual?

  • Joint Use poles fitted with "2 sources of supply" labels?

  • Pit, Conduit and Cable alignments and depths correct or approved?

  • Shallow conduits concrete encased and shallow conduit markers installed to BSD 4015?

  • Correct pole / column, vertical and on correct alignment?

  • Correct luminaire installed at correct height?

  • Installation complies with PLCM, including civil work?

  • Wood grease applied to metal work penetrating timber poles

  • Electrical connections scratch-brushed and greased?

  • All IPC shear heads have separated correctly?

  • OH service cable statutory clearances maintained?

  • OH service cable sag correct (within 10%)?

  • Electrical installation in working order?

  • LV connections correct and installation electrically safe?

  • Earth electrode and main earthing conductor installation complies with AS/NZS:3000 and is correctly located?

  • Test results within specified limits?

  • Relevant Certificate of Test completed and submitted? (R2 or R3)

  • Worksite reinstated, all waste removed and left with no potential for environmental harm to occur?

  • Comments / Other?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.