Audit Information
-
Document No.
BWCR - Building Walkthrough Condition Report
-
Audit Title example: ( BWCR Mathematics Building )
-
Campus and Grid Ref example ( Sandy Bay AL23 )
-
Date of Inspection:
-
Audit Undertaken by:
- Barry Russell
- Alan Mason
- Troy Finearty
- Mark White
- Roger Wallis
- Andrew Southorn
- Greg Chandler
- Mike Bird
- Other Person
-
Enter name of auditor here:
-
Personnel in attendance:
Commom Spaces
-
Staff and Students Present
Common Areas Assessment PASS or FAIL is scored
Kitchen or Staff Tearoom
-
Kitchen or TeaRoom
Staff Tea Room
-
Location
-
Lighting (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Flooring (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Bench including splash backs (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Hot water temperature at tap tempered to not scald (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Kitchen equipment used safely without risk. Check for adequate GPO's (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Ovens and White Goods in good working order and clean (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Waste Bin adequate (if Fail add details and WO # for repairs)
-
Work Order Ref #:
Bathroom
-
Bathroom
-
Location
-
Toilet (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Bath (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Shower (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Basin (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Floor (if Fail add details and WO # for repairs)
-
Work Order Ref #:
-
Other (if Fail add details and WO # for repairs)
-
Work Order Ref #:
Stair or Landing
-
Stairs or Landing (if Fail add details and WO # for repairs)
-
Work Order Ref #:
Other Common Space
-
Other common space
Space
-
Other Common Space Type
- Lobby
- Entrance
- Corridor
- Stairway
- Roof Deck
- BBQ Space
- Covered Way
-
Room Number and/or Space Description
-
Add comments and photo if FAIL
-
Work Order Ref #:
Room Audits
Room Audits CONDITION is scored
-
Room
-
Room Level
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
-
Room Type
- Office
- Utility Room
- Laboratory
- CMLS
- LMLS
- Open Plan Space
- Lobby
- Corridor
- Entrance
-
Room Type
- Office
- Utility Room
- Laboratory
- CMLS
- LMLS
- Open Plan Space
- Lobby
- Corridor
- Entrance
-
Room Type
- Office
- Utility Room
- Laboratory
- CMLS
- LMLS
- Open Plan Space
- Lobby
- Corridor
- Entrance
-
Room Type
- Office
- Utility Room
- Laboratory
- CMLS
- LMLS
- Open Plan Space
- Lobby
- Corridor
- Entrance
-
Room Type
- Office
- Utility Room
- Laboratory
- CMLS
- LMLS
- Open Plan Space
- Lobby
- Corridor
- Entrance
-
Room Type
- Office
- Utility Room
- Laboratory
- CMLS
- LMLS
- Open Plan Space
- Lobby
- Corridor
- Entrance
-
Room No:
-
Future Maintenance Planning Notes - TAP HERE
-
URGENT Repair Comments here:
-
Work Order Ref #:
-
Add media
-
Room annex
Annex
-
Room No:
-
Future Maintenance Planning Notes - TAP HERE
-
URGENT Repair Comments here:
-
Work Order Ref #:
-
Add media
Next Room (select + in the above section to add new room)
Final Checks
Final Site Observations
-
Auto sliding doors functionality - Noisy ? Adjustments OK ?
-
Building interiors are generally clean ?
-
Building has compliant disability access and access signage:<br><br>- access points and footpath crossovers for wheelchairs ?<br>- access toilets in building ?<br>- wayfinding signage front entrance to assess toilets ?
Comments
-
General Comments about the buildings appearance; (first impressions)
-
Some areas will require a follow up inspection
-
Add details of follow up items here:
-
Date of proposed follow up inspection:
Signature of Auditor
-
Select the name of the person signing the review, then select "Sign"
- Barry Russell
- Alan Mason
- Troy Finearty
- Mark White
- Roger Wallis
- Andrew Southorn
- Greg Chandler
- Mike Bird
- Other Person
-
if Other Person, then enter name in the space below then select "Sign"
-
Add signature