Safety

General alarm

Ques 1) Identification with IMO Symbol

Details (if any)

Image

Action Required

Due Date

Ques 2) Manual call points glass covers

Details (if any)

Image

Action Required

Due Date

Ques 3) Operation test

Details (if any)

Image

Action Required

Due Date

Ques 4) Auto closure of fire doors to be tested with activation of alarm

Details (if any)

Image

Action Required

Due Date
Fire detectors & alarm

Ques 1) Identification of detectors

Details (if any)

Image

Action Required

Due Date

Ques 2) Any alarm fault on Panel

Details (if any)

Image

Action Required

Due Date

Ques 3) No isolation of zone

Details (if any)

Image

Action Required

Due Date

Ques 4) Operational test & Test Record

Details (if any)

Image

Action Required

Due Date

Ques 5) Check testing kit for all types of detectors on board.

Details (if any)

Image

Action Required

Due Date

Ques 6) Cargo hold sampling system working

Details (if any)

Image

Action Required

Due Date
Vent Fans & Flaps

Ques 1) O-S- Marking

Details (if any)

Image

Action Required

Due Date

Ques 2) Identification marking

Details (if any)

Image

Action Required

Due Date

Ques 3) External condition

Details (if any)

Image

Action Required

Due Date

Ques 4) Operational condition

Details (if any)

Image

Action Required

Due Date

Ques 5) Closing completely

Details (if any)

Image

Action Required

Due Date

Ques 6) Wire mesh condition

Details (if any)

Image

Action Required

Due Date

Ques 7) Testing record


Details (if any)

Image

Action Required

Due Date
Emergency Stops

Ques 1) Operational test & Test Record (Eng room / Accom & Car Decks)

Details (if any)

Image

Action Required

Due Date

Ques 2) Operating instructions

Details (if any)

Image

Action Required

Due Date

Ques 3) Identification of areas served

Details (if any)

Image

Action Required

Due Date

Ques 4) IMO Symbols

Details (if any)

Image

Action Required

Due Date

Ques 5) Quick Closing valves

Details (if any)

Image

Action Required

Due Date

Ques 6) Air bottle pressure (for serving QCV)

Details (if any)

Image

Action Required

Due Date
Fixed foam system

Ques 1) Operating instructions

Details (if any)

Image

Action Required

Due Date

Ques 2) Any leaks in the lines

Details (if any)

Image

Action Required

Due Date

Ques 3) Level Guage & Liquid level

Details (if any)

Image

Action Required

Due Date

Ques 4) Last analysis report


Details (if any)

Image

Action Required

Due Date

Ques 5) Lines Last blown record

Details (if any)

Image

Action Required

Due Date
Hypermist System

Ques 1) Operating instructions

Details (if any)

Image

Action Required

Due Date

Ques 2) State of readiness (Kept on Auto & FW from tank valve to be open)

Details (if any)

Image

Action Required

Due Date

Ques 3) Last line blown record

Details (if any)

Image

Action Required

Due Date

Ques 4) Last tested for pump operation


Details (if any)

Image

Action Required

Due Date

Ques 5) Min Water level marking on FW tank


Details (if any)

Image

Action Required

Due Date
Fixed CO2 System

Ques 1) Operating instructions

Details (if any)

Image

Action Required

Due Date

Ques 2) CO2 room Fan

Details (if any)

Image

Action Required

Due Date

Ques 3) Natural Vent


Details (if any)

Image

Action Required

Due Date

Ques 4) Bottles Securing

Details (if any)

Image

Action Required

Due Date

Ques 5) Transporting / Locking pin removed (for operational readiness)

Details (if any)

Image

Action Required

Due Date

Ques 6) Operational test + Alarm testing record


Details (if any)

Image

Action Required

Due Date

Ques 7) Inspection and Hydro testing marks



Details (if any)

Image

Action Required

Due Date

Ques 8) Test Records + Certificate


Details (if any)

Image

Action Required

Due Date
Low Pressure CO2 System

Ques 1) Operating instructions

Details (if any)

Image

Action Required

Due Date

Ques 2) CO2 room Fan

Details (if any)

Image

Action Required

Due Date

Ques 3) Natural Vent


Details (if any)

Image

Action Required

Due Date

Ques 4) Liquid level


Details (if any)

Image

Action Required

Due Date

Ques 5) Testing arrangement operational


Details (if any)

Image

Action Required

Due Date

Ques 6) Operational readiness



Details (if any)

Image

Action Required

Due Date

Ques 7) Operational test + Alarm testing record




Details (if any)

Image

Action Required

Due Date

Ques 8) Associated guages of system



Details (if any)

Image

Action Required

Due Date

Ques 9) Excessive icing / Insulation condition




Details (if any)

Image

Action Required

Due Date

Ques 10) How many compressors working / Frequency of cut-in/cut-off




Details (if any)

Image

Action Required

Due Date

Ques 11) Compressor parameters & Checks




Details (if any)

Image

Action Required

Due Date

Ques 12) Safety guards for belts in place




Details (if any)

Image

Action Required

Due Date
Sprinkler system

Ques 1) Last line blow through

Details (if any)

Image

Action Required

Due Date

Ques 2) Pipe line & Nozzles condition

Details (if any)

Image

Action Required

Due Date

Ques 3) Valve freely operational and marked


Details (if any)

Image

Action Required

Due Date
Emergency Fire pump

Ques 1) Operating instructions

Details (if any)

Image

Action Required

Due Date

Ques 2) General condition - No leaks etc


Details (if any)

Image

Action Required

Due Date

Ques 3) Minimum draft for suction to be marked



Details (if any)

Image

Action Required

Due Date

Ques 4) Operation test - 2 hoses, one on forwardmost part and one at highest part of vessel



Details (if any)

Image

Action Required

Due Date

Ques 5) Priming pump condition



Details (if any)

Image

Action Required

Due Date

Ques 6) Suction valve to be open at all times - Operational readiness



Details (if any)

Image

Action Required

Due Date

Ques 7) Emergency fire pump room bilges transfer valves moving freely


Details (if any)

Image

Action Required

Due Date
Foam Applicator

Ques 1) IMO Symbol

Details (if any)

Image

Action Required

Due Date

Ques 2) Hoses and Nozzles condition

Details (if any)

Image

Action Required

Due Date

Ques 3) Expiry Dates / Test date Check


Details (if any)

Image

Action Required

Due Date

Ques 4) Securing arrangement


Details (if any)

Image

Action Required

Due Date
Fire main/hydrants

Ques 1) IMO Symbol at location


Details (if any)

Image

Action Required

Due Date

Ques 2) Pipe line condition, specially underside



Details (if any)

Image

Action Required

Due Date

Ques 3) Last pressure test stencil



Details (if any)

Image

Action Required

Due Date

Ques 4) Expansion Joint


Details (if any)

Image

Action Required

Due Date

Ques 5) Drain valves - Identified and marked



Details (if any)

Image

Action Required

Due Date

Ques 6) Isolating valves - Identified and marked



Details (if any)

Image

Action Required

Due Date

Ques 7) U clamps


Details (if any)

Image

Action Required

Due Date

Ques 8) Hydrant caps (Connected with chain/rope etc)


Details (if any)

Image

Action Required

Due Date

Ques 9) Free to open & Close


Details (if any)

Image

Action Required

Due Date

Ques 10) Condition of Rubber gasket in hydrant



Details (if any)

Image

Action Required

Due Date
Extinguishers

Ques 1) IMO Symbol at location


Details (if any)

Image

Action Required

Due Date

Ques 2) Adequate numbers & Spares as per approved fire plan



Details (if any)

Image

Action Required

Due Date

Ques 3) Last test record & Certificate



Details (if any)

Image

Action Required

Due Date

Ques 4) Operating instructions (incl Temp range)



Details (if any)

Image

Action Required

Due Date

Ques 5) Condition of body; Hose & Pressure on guage



Details (if any)

Image

Action Required

Due Date

Ques 6) Marked for location (as per number)



Details (if any)

Image

Action Required

Due Date

Ques 7) Inspection card

Details (if any)

Image

Action Required

Due Date
Hoses and nozzles

Ques 1) Adequate numbers as per approved fire plan


Details (if any)

Image

Action Required

Due Date

Ques 2) Spares one of each type



Details (if any)

Image

Action Required

Due Date

Ques 3) Condition of hose - Brittleness/inner lining etc



Details (if any)

Image

Action Required

Due Date

Ques 4) Coupling secured with wire (No jubilee clamps allowed)


Details (if any)

Image

Action Required

Due Date

Ques 5) Coupling reuuber gasket condition



Details (if any)

Image

Action Required

Due Date

Ques 6) All dual type nozzles, operating freely



Details (if any)

Image

Action Required

Due Date

Ques 7) Nozzle ruuber gaskets condition



Details (if any)

Image

Action Required

Due Date

Ques 8) Spanner with each hose connection


Details (if any)

Image

Action Required

Due Date

Ques 9) Hose box condition



Details (if any)

Image

Action Required

Due Date
Fire Station

Ques 1) IMO Symbol


Details (if any)

Image

Action Required

Due Date

Ques 2) International Shore Connection


Details (if any)

Image

Action Required

Due Date

Ques 3) With spare bolts/ Gaskets and 2 spanners




Details (if any)

Image

Action Required

Due Date

Ques 4) All equipment as per Fire plan



Details (if any)

Image

Action Required

Due Date

Ques 5) Any alarms in detection panels




Details (if any)

Image

Action Required

Due Date
Fireman's outfit & SCBA

Ques 1) Condition of Mask - Any cracks/ air tightness, rubber condition


Details (if any)

Image

Action Required

Due Date

Ques 2) Gloves - All fingers to be separate



Details (if any)

Image

Action Required

Due Date

Ques 3) Gloves length to overlap the jacket hand

Details (if any)

Image

Action Required

Due Date

Ques 4) Silver lining condition - No cracks etc


Details (if any)

Image

Action Required

Due Date

Ques 5) Fire retardant boots



Details (if any)

Image

Action Required

Due Date

Ques 6) Life line and securing clip condition



Details (if any)

Image

Action Required

Due Date

Ques 7) Condition of SCBA + Complete checks


Details (if any)

Image

Action Required

Due Date

Ques 8) Bottles with sufficient pressure


Details (if any)

Image

Action Required

Due Date

Ques 9) Fire axe + Torch Condition



Details (if any)

Image

Action Required

Due Date
EEBD

Ques 1) Sufficient numbers as per SEQ


Details (if any)

Image

Action Required

Due Date

Ques 2) Pressure guage in green range


Details (if any)

Image

Action Required

Due Date

Ques 3) Inspection records




Details (if any)

Image

Action Required

Due Date

Ques 4) Training unit on board




Details (if any)

Image

Action Required

Due Date
Emergency Lighting

Ques 1) Check all working


Details (if any)

Image

Action Required

Due Date

Ques 2) Marking visible (Red dot or equivalent)


Details (if any)

Image

Action Required

Due Date

Ques 3) Record of testing




Details (if any)

Image

Action Required

Due Date

Ques 4) Adequate spares available





Details (if any)

Image

Action Required

Due Date
Life Jacket / Immersion Suits

Ques 1) Sufficient numbers as per SEQ


Details (if any)

Image

Action Required

Due Date

Ques 2) Condition - Any damages etc


Details (if any)

Image

Action Required

Due Date

Ques 3) Markings - Name / POR




Details (if any)

Image

Action Required

Due Date

Ques 4) Light (expiry dates)/Whistle



Details (if any)

Image

Action Required

Due Date

Ques 5) Immersion Suits Seam Leak test record





Details (if any)

Image

Action Required

Due Date
Life buyos

Ques 1) Sufficient numbers as per SEQ

Details (if any)

Image

Action Required

Due Date

Ques 2) General condition - No cracks



Details (if any)

Image

Action Required

Due Date

Ques 3) Marking visible (Name / POR)

Details (if any)

Image

Action Required

Due Date

Ques 4) SI Light in working condition


Details (if any)

Image

Action Required

Due Date

Ques 5) Line Condition + Length



Details (if any)

Image

Action Required

Due Date

Ques 6) MOB Marker - Expiry date



Details (if any)

Image

Action Required

Due Date

Ques 7) MOB Marker - Correctly installed / Operational readiness



Details (if any)

Image

Action Required

Due Date
LTA + Pyrotechnics

Ques 1) Sufficient as per SEQ / SOLAS

Details (if any)

Image

Action Required

Due Date

Ques 2) Expiry dates within limit (not less than 3 months from date of inspection)



Details (if any)

Image

Action Required

Due Date

Ques 3) IMO Symbols marked at locations





Details (if any)

Image

Action Required

Due Date
Life Rafts

Ques 1) Expiry Date

Details (if any)

Image

Action Required

Due Date

Ques 2) HRU correctly rigged

Details (if any)

Image

Action Required

Due Date

Ques 3) Launching instructions displayed under emcy lighting


Details (if any)

Image

Action Required

Due Date

Ques 4) Container condition + Markings per SOLAS


Details (if any)

Image

Action Required

Due Date

Ques 5) Transportation straps removed


Details (if any)

Image

Action Required

Due Date

Ques 6) Container with Certificate



Details (if any)

Image

Action Required

Due Date

Ques 7) Cradle condition & Release handle free to move



Details (if any)

Image

Action Required

Due Date

Ques 8) Certificate



Details (if any)

Image

Action Required

Due Date

Ques 9) Davits condition




Details (if any)

Image

Action Required

Due Date

Ques 10) Free to move - Handle working & highlighted




Details (if any)

Image

Action Required

Due Date

Ques 11) Atlas hook condition for davit launched rafts




Details (if any)

Image

Action Required

Due Date

Ques 12) Wire condition for davit launched




Details (if any)

Image

Action Required

Due Date
Life Boat (P)

Ques 1) Operating instructions under emcy lighting

Details (if any)

Image

Action Required

Due Date

Ques 2) Exterior condition (Specially under resting pads)


Details (if any)

Image

Action Required

Due Date

Ques 3) Markings - Name / POR / No. of Pers / dimensions etc


Details (if any)

Image

Action Required

Due Date

Ques 4) Ford & Aft hook foundation and Release cable condition


Details (if any)

Image

Action Required

Due Date

Ques 5) Grabline condition


Details (if any)

Image

Action Required

Due Date

Ques 6) Skates condition



Details (if any)

Image

Action Required

Due Date

Ques 7) Non return valve ball condition



Details (if any)

Image

Action Required

Due Date

Ques 8) Propeller condition



Details (if any)

Image

Action Required

Due Date

Ques 9) Rudder Condition




Details (if any)

Image

Action Required

Due Date

Ques 10) Painter condition





Details (if any)

Image

Action Required

Due Date

Ques 11) Window Glass condition




Details (if any)

Image

Action Required

Due Date

Ques 12) RR Tapes condition




Details (if any)

Image

Action Required

Due Date

Ques 13) Door hinge and locking condition



Details (if any)

Image

Action Required

Due Date

Ques 14) General cleanliness




Details (if any)

Image

Action Required

Due Date

Ques 15) Seating marking




Details (if any)

Image

Action Required

Due Date

Ques 16) Safety belt (incl. hooks) condition

Details (if any)

Image

Action Required

Due Date

Ques 17) Operating instructions (Engine and onload/offload release)




Details (if any)

Image

Action Required

Due Date

Ques 18) Hook release correctly reset




Details (if any)

Image

Action Required

Due Date

Ques 19) Compass and its light condition




Details (if any)

Image

Action Required

Due Date

Ques 20) Searchlight condition





Details (if any)

Image

Action Required

Due Date

Ques 21) Internal & Canopy Light working




Details (if any)

Image

Action Required

Due Date

Ques 22) Test engine on both sources



Details (if any)

Image

Action Required

Due Date

Ques 23) Bilge pump operation




Details (if any)

Image

Action Required

Due Date

Ques 24) Bilges clean and dry




Details (if any)

Image

Action Required

Due Date

Ques 25) Rudder operation (Incl. emcy ops)




Details (if any)

Image

Action Required

Due Date

Ques 26) Fire extinguisher




Details (if any)

Image

Action Required

Due Date

Ques 27) Ration / Pyrotech / First aid kit etc expiry dates




Details (if any)

Image

Action Required

Due Date

Ques 28) FPD & Recovery strops





Details (if any)

Image

Action Required

Due Date
L/B Davit (P)

Ques 1) Foundation condition

Details (if any)

Image

Action Required

Due Date

Ques 2) Limit Switches

Details (if any)

Image

Action Required

Due Date

Ques 3) Davit winch + Manual operating lever



Details (if any)

Image

Action Required

Due Date

Ques 4) Harbour pins


Details (if any)

Image

Action Required

Due Date

Ques 5) Sheaves

Details (if any)

Image

Action Required

Due Date

Ques 6) Floating blocks



Details (if any)

Image

Action Required

Due Date

Ques 7) Boat Falls



Details (if any)

Image

Action Required

Due Date

Ques 8) Winch motor + Gear Oil level



Details (if any)

Image

Action Required

Due Date

Ques 9) General appearance (Rust etc)




Details (if any)

Image

Action Required

Due Date

Ques 10) General Lubrication




Details (if any)

Image

Action Required

Due Date

Ques 11) Last wire renewal date





Details (if any)

Image

Action Required

Due Date
Embarkation Ladder(P)

Ques 1) Canvas Cover


Details (if any)

Image

Action Required

Due Date

Ques 2) Shackle Condition


Details (if any)

Image

Action Required

Due Date

Ques 3) Rope condition





Details (if any)

Image

Action Required

Due Date

Ques 4) Steps Condition



Details (if any)

Image

Action Required

Due Date
Life Boat (S)

Ques 1) Operating instructions under emcy lighting

Details (if any)

Image

Action Required

Due Date

Ques 2) Exterior condition (Specially under resting pads)


Details (if any)

Image

Action Required

Due Date

Ques 3) Markings - Name / POR / No. of Pers / dimensions etc


Details (if any)

Image

Action Required

Due Date

Ques 4) Ford & Aft hook foundation and Release cable condition


Details (if any)

Image

Action Required

Due Date

Ques 5) Grabline condition


Details (if any)

Image

Action Required

Due Date

Ques 6) Skates condition



Details (if any)

Image

Action Required

Due Date

Ques 7) Non return valve ball condition



Details (if any)

Image

Action Required

Due Date

Ques 8) Propeller condition



Details (if any)

Image

Action Required

Due Date

Ques 9) Rudder Condition




Details (if any)

Image

Action Required

Due Date

Ques 10) Painter condition





Details (if any)

Image

Action Required

Due Date

Ques 11) Window Glass condition




Details (if any)

Image

Action Required

Due Date

Ques 12) RR Tapes condition




Details (if any)

Image

Action Required

Due Date

Ques 13) Door hinge and locking condition



Details (if any)

Image

Action Required

Due Date

Ques 14) General cleanliness




Details (if any)

Image

Action Required

Due Date

Ques 15) Seating marking




Details (if any)

Image

Action Required

Due Date

Ques 16) Safety belt (incl. hooks) condition

Details (if any)

Image

Action Required

Due Date

Ques 17) Operating instructions (Engine and onload/offload release)




Details (if any)

Image

Action Required

Due Date

Ques 18) Hook release correctly reset




Details (if any)

Image

Action Required

Due Date

Ques 19) Compass and its light condition




Details (if any)

Image

Action Required

Due Date

Ques 20) Searchlight condition





Details (if any)

Image

Action Required

Due Date

Ques 21) Internal & Canopy Light working




Details (if any)

Image

Action Required

Due Date

Ques 22) Test engine on both sources



Details (if any)

Image

Action Required

Due Date

Ques 23) Bilge pump operation




Details (if any)

Image

Action Required

Due Date

Ques 24) Bilges clean and dry




Details (if any)

Image

Action Required

Due Date

Ques 25) Rudder operation (Incl. emcy ops)




Details (if any)

Image

Action Required

Due Date

Ques 26) Fire extinguisher




Details (if any)

Image

Action Required

Due Date

Ques 27) Ration / Pyrotech / First aid kit etc expiry dates




Details (if any)

Image

Action Required

Due Date

Ques 28) FPD & Recovery strops





Details (if any)

Image

Action Required

Due Date
L/B Davit (S)

Ques 1) Foundation condition

Details (if any)

Image

Action Required

Due Date

Ques 2) Limit Switches

Details (if any)

Image

Action Required

Due Date

Ques 3) Davit winch + Manual operating lever



Details (if any)

Image

Action Required

Due Date

Ques 4) Harbour pins


Details (if any)

Image

Action Required

Due Date

Ques 5) Sheaves

Details (if any)

Image

Action Required

Due Date

Ques 6) Floating blocks



Details (if any)

Image

Action Required

Due Date

Ques 7) Boat Falls



Details (if any)

Image

Action Required

Due Date

Ques 8) Winch motor + Gear Oil level



Details (if any)

Image

Action Required

Due Date

Ques 9) General appearance (Rust etc)




Details (if any)

Image

Action Required

Due Date

Ques 10) General Lubrication




Details (if any)

Image

Action Required

Due Date

Ques 11) Last wire renewal date





Details (if any)

Image

Action Required

Due Date
Embarkation Ladder(S)

Ques 1) Canvas Cover


Details (if any)

Image

Action Required

Due Date

Ques 2) Shackle Condition


Details (if any)

Image

Action Required

Due Date

Ques 3) Rope condition





Details (if any)

Image

Action Required

Due Date

Ques 4) Steps Condition



Details (if any)

Image

Action Required

Due Date
Free Fall Lifeboat

Ques 1) Operating instructions under emcy lighting

Details (if any)

Image

Action Required

Due Date

Ques 2) Exterior condition (Specially under resting pads)


Details (if any)

Image

Action Required

Due Date

Ques 3) Markings - Name / POR / No. of Pers / dimensions etc


Details (if any)

Image

Action Required

Due Date

Ques 4) Release Mechanism


Details (if any)

Image

Action Required

Due Date

Ques 5) Grabline condition


Details (if any)

Image

Action Required

Due Date

Ques 6) Propeller Condition



Details (if any)

Image

Action Required

Due Date

Ques 7) Rudder Condition



Details (if any)

Image

Action Required

Due Date

Ques 8) Window Glass condition




Details (if any)

Image

Action Required

Due Date

Ques 9) RR Tapes condition




Details (if any)

Image

Action Required

Due Date

Ques 10) Door hinge and locking condition



Details (if any)

Image

Action Required

Due Date

Ques 11) General cleanliness




Details (if any)

Image

Action Required

Due Date

Ques 12) Seat Condition




Details (if any)

Image

Action Required

Due Date

Ques 13) Safety belt (incl. hooks) condition

Details (if any)

Image

Action Required

Due Date

Ques 14) Operating instructions (Engine and onload/offload release)




Details (if any)

Image

Action Required

Due Date

Ques 15) Hook release correctly reset




Details (if any)

Image

Action Required

Due Date

Ques 16) Compass and its light condition




Details (if any)

Image

Action Required

Due Date

Ques 17) Searchlight condition





Details (if any)

Image

Action Required

Due Date

Ques 18) Internal & Canopy Light working




Details (if any)

Image

Action Required

Due Date

Ques 19) Test engine on both sources



Details (if any)

Image

Action Required

Due Date

Ques 20) Bilge pump operation




Details (if any)

Image

Action Required

Due Date

Ques 21) Bilges clean and dry




Details (if any)

Image

Action Required

Due Date

Ques 22) Rudder operation (Incl. emcy ops)




Details (if any)

Image

Action Required

Due Date

Ques 23) Fire extinguisher




Details (if any)

Image

Action Required

Due Date

Ques 24) Ration / Pyrotech / First aid kit etc expiry dates




Details (if any)

Image

Action Required

Due Date
FF L/B Davit

Ques 1) Foundation condition

Details (if any)

Image

Action Required

Due Date

Ques 2) Limit Switches

Details (if any)

Image

Action Required

Due Date

Ques 3) Condition of Hyd Cylinder ; Hyd Lines & Operating levers (Hyd Leaks)




Details (if any)

Image

Action Required

Due Date

Ques 4) Harbour pins


Details (if any)

Image

Action Required

Due Date

Ques 5) Sheaves

Details (if any)

Image

Action Required

Due Date

Ques 6) Floating blocks



Details (if any)

Image

Action Required

Due Date

Ques 7) Wire condition




Details (if any)

Image

Action Required

Due Date

Ques 8) Winch motor + Gear Oil level



Details (if any)

Image

Action Required

Due Date

Ques 9) General appearance (Rust etc)




Details (if any)

Image

Action Required

Due Date

Ques 10) General Lubrication




Details (if any)

Image

Action Required

Due Date
Rescue Boat/Fast RB

Ques 1) Operating instructions under emcy lighting

Details (if any)

Image

Action Required

Due Date

Ques 2) Exterior condition

Details (if any)

Image

Action Required

Due Date

Ques 3) Markings - Name / POR / No. of Pers / dimensions etc



Details (if any)

Image

Action Required

Due Date

Ques 4) Atlas hook condition


Details (if any)

Image

Action Required

Due Date

Ques 5) Wires condition

Details (if any)

Image

Action Required

Due Date

Ques 6) RB, Equipment



Details (if any)

Image

Action Required

Due Date

Ques 7) Boat Lashings & resting block condition




Details (if any)

Image

Action Required

Due Date

Ques 8) Condition of canvas cover




Details (if any)

Image

Action Required

Due Date
L/B Davit (P)

Ques 1) Foundation condition

Details (if any)

Image

Action Required

Due Date

Ques 2) Limit Switches

Details (if any)

Image

Action Required

Due Date

Ques 3) Davit winch + Manual operating lever



Details (if any)

Image

Action Required

Due Date

Ques 4) Harbour pins


Details (if any)

Image

Action Required

Due Date

Ques 5) Sheaves

Details (if any)

Image

Action Required

Due Date

Ques 6) Floating blocks



Details (if any)

Image

Action Required

Due Date

Ques 7) Boat Falls



Details (if any)

Image

Action Required

Due Date

Ques 8) Winch motor + Gear Oil level



Details (if any)

Image

Action Required

Due Date

Ques 9) General appearance (Rust etc)




Details (if any)

Image

Action Required

Due Date

Ques 10) General Lubrication




Details (if any)

Image

Action Required

Due Date

Ques 11) Last wire renewal date





Details (if any)

Image

Action Required

Due Date
L/B Davit (S)

Ques 1) Foundation condition

Details (if any)

Image

Action Required

Due Date

Ques 2) Limit Switches

Details (if any)

Image

Action Required

Due Date

Ques 3) Davit winch + Manual operating lever



Details (if any)

Image

Action Required

Due Date

Ques 4) Harbour pins


Details (if any)

Image

Action Required

Due Date

Ques 5) Sheaves

Details (if any)

Image

Action Required

Due Date

Ques 6) Floating blocks



Details (if any)

Image

Action Required

Due Date

Ques 7) Boat Falls



Details (if any)

Image

Action Required

Due Date

Ques 8) Winch motor + Gear Oil level



Details (if any)

Image

Action Required

Due Date

Ques 9) General appearance (Rust etc)




Details (if any)

Image

Action Required

Due Date

Ques 10) General Lubrication




Details (if any)

Image

Action Required

Due Date

Ques 11) Last wire renewal date





Details (if any)

Image

Action Required

Due Date
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.