Title Page
-
Deck
-
Deck
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Safety
General alarm
-
Ques 1) Identification with IMO Symbol<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Manual call points glass covers<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Operation test<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Auto closure of fire doors to be tested with activation of alarm<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Fire detectors & alarm
-
Ques 1) Identification of detectors<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Any alarm fault on Panel<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) No isolation of zone<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Operational test & Test Record<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Check testing kit for all types of detectors on board.<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Cargo hold sampling system working<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Vent Fans & Flaps
-
Ques 1) O-S- Marking<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Identification marking<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) External condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Operational condition<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Closing completely <br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Wire mesh condition <br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Testing record<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Emergency Stops
-
Ques 1) Operational test & Test Record (Eng room / Accom & Car Decks)<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Operating instructions<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Identification of areas served<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) IMO Symbols<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Quick Closing valves<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Air bottle pressure (for serving QCV)<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Fixed foam system
-
Ques 1) Operating instructions<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Any leaks in the lines<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Level Guage & Liquid level<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Last analysis report<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Lines Last blown record<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Hypermist System
-
Ques 1) Operating instructions<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) State of readiness (Kept on Auto & FW from tank valve to be open)<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Last line blown record<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Last tested for pump operation<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Min Water level marking on FW tank<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Fixed CO2 System
-
Ques 1) Operating instructions<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) CO2 room Fan<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Natural Vent <br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Bottles Securing<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Transporting / Locking pin removed (for operational readiness)<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Operational test + Alarm testing record<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Inspection and Hydro testing marks<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Test Records + Certificate<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Low Pressure CO2 System
-
Ques 1) Operating instructions<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) CO2 room Fan<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Natural Vent <br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Liquid level<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Testing arrangement operational<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Operational readiness<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Operational test + Alarm testing record<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Associated guages of system<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) Excessive icing / Insulation condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) How many compressors working / Frequency of cut-in/cut-off<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Compressor parameters & Checks<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 12) Safety guards for belts in place<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Sprinkler system
-
Ques 1) Last line blow through<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Pipe line & Nozzles condition<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Valve freely operational and marked<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Emergency Fire pump
-
Ques 1) Operating instructions<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) General condition - No leaks etc<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Minimum draft for suction to be marked<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Operation test - 2 hoses, one on forwardmost part and one at highest part of vessel<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Priming pump condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Suction valve to be open at all times - Operational readiness<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Emergency fire pump room bilges transfer valves moving freely<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Foam Applicator
-
Ques 1) IMO Symbol<br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Hoses and Nozzles condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Expiry Dates / Test date Check<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Securing arrangement<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Fire main/hydrants
-
Ques 1) IMO Symbol at location<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Pipe line condition, specially underside<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Last pressure test stencil<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Expansion Joint<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Drain valves - Identified and marked<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Isolating valves - Identified and marked<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) U clamps<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Hydrant caps (Connected with chain/rope etc)<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) Free to open & Close<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) Condition of Rubber gasket in hydrant<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Extinguishers
-
Ques 1) IMO Symbol at location<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Adequate numbers & Spares as per approved fire plan<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Last test record & Certificate<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Operating instructions (incl Temp range)<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Condition of body; Hose & Pressure on guage<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Marked for location (as per number)<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Inspection card <br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Hoses and nozzles
-
Ques 1) Adequate numbers as per approved fire plan<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Spares one of each type<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Condition of hose - Brittleness/inner lining etc<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Coupling secured with wire (No jubilee clamps allowed)<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Coupling reuuber gasket condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) All dual type nozzles, operating freely<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Nozzle ruuber gaskets condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Spanner with each hose connection<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) Hose box condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Fire Station
-
Ques 1) IMO Symbol<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) International Shore Connection<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) With spare bolts/ Gaskets and 2 spanners<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) All equipment as per Fire plan<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Any alarms in detection panels<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Fireman's outfit & SCBA
-
Ques 1) Condition of Mask - Any cracks/ air tightness, rubber condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Gloves - All fingers to be separate<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Gloves length to overlap the jacket hand
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Silver lining condition - No cracks etc<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Fire retardant boots<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Life line and securing clip condition <br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Condition of SCBA + Complete checks<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Bottles with sufficient pressure<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) Fire axe + Torch Condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
EEBD
-
Ques 1) Sufficient numbers as per SEQ<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Pressure guage in green range<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Inspection records<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Training unit on board<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Emergency Lighting
-
Ques 1) Check all working<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Marking visible (Red dot or equivalent)<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Record of testing<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Adequate spares available<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Life Jacket / Immersion Suits
-
Ques 1) Sufficient numbers as per SEQ<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Condition - Any damages etc<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Markings - Name / POR<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Light (expiry dates)/Whistle<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Immersion Suits Seam Leak test record<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Life buyos
-
Ques 1) Sufficient numbers as per SEQ
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) General condition - No cracks<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Marking visible (Name / POR)
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) SI Light in working condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Line Condition + Length<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) MOB Marker - Expiry date<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) MOB Marker - Correctly installed / Operational readiness<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
LTA + Pyrotechnics
-
Ques 1) Sufficient as per SEQ / SOLAS
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Expiry dates within limit (not less than 3 months from date of inspection)<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) IMO Symbols marked at locations<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Life Rafts
-
Ques 1) Expiry Date<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) HRU correctly rigged<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Launching instructions displayed under emcy lighting<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Container condition + Markings per SOLAS<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Transportation straps removed<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Container with Certificate <br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Cradle condition & Release handle free to move<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Certificate<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) Davits condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) Free to move - Handle working & highlighted<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Atlas hook condition for davit launched rafts<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 12) Wire condition for davit launched<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Life Boat (P)
-
Ques 1) Operating instructions under emcy lighting<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Exterior condition (Specially under resting pads)<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Markings - Name / POR / No. of Pers / dimensions etc<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Ford & Aft hook foundation and Release cable condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Grabline condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Skates condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Non return valve ball condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Propeller condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) Rudder Condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) Painter condition<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Window Glass condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 12) RR Tapes condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 13) Door hinge and locking condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 14) General cleanliness<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 15) Seating marking<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 16) Safety belt (incl. hooks) condition
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 17) Operating instructions (Engine and onload/offload release)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 18) Hook release correctly reset<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 19) Compass and its light condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 20) Searchlight condition<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 21) Internal & Canopy Light working<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 22) Test engine on both sources<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 23) Bilge pump operation<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 24) Bilges clean and dry<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 25) Rudder operation (Incl. emcy ops)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 26) Fire extinguisher<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 27) Ration / Pyrotech / First aid kit etc expiry dates<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 28) FPD & Recovery strops<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
L/B Davit (P)
-
Ques 1) Foundation condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Limit Switches<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Davit winch + Manual operating lever<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Harbour pins<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Sheaves<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Floating blocks<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Boat Falls<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Winch motor + Gear Oil level<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) General appearance (Rust etc)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) General Lubrication<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Last wire renewal date<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Embarkation Ladder(P)
-
Ques 1) Canvas Cover<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Shackle Condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Rope condition<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Steps Condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Life Boat (S)
-
Ques 1) Operating instructions under emcy lighting<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Exterior condition (Specially under resting pads)<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Markings - Name / POR / No. of Pers / dimensions etc<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Ford & Aft hook foundation and Release cable condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Grabline condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Skates condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Non return valve ball condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Propeller condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) Rudder Condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) Painter condition<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Window Glass condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 12) RR Tapes condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 13) Door hinge and locking condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 14) General cleanliness<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 15) Seating marking<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 16) Safety belt (incl. hooks) condition
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 17) Operating instructions (Engine and onload/offload release)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 18) Hook release correctly reset<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 19) Compass and its light condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 20) Searchlight condition<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 21) Internal & Canopy Light working<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 22) Test engine on both sources<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 23) Bilge pump operation<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 24) Bilges clean and dry<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 25) Rudder operation (Incl. emcy ops)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 26) Fire extinguisher<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 27) Ration / Pyrotech / First aid kit etc expiry dates<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 28) FPD & Recovery strops<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
L/B Davit (S)
-
Ques 1) Foundation condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Limit Switches<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Davit winch + Manual operating lever<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Harbour pins<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Sheaves<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Floating blocks<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Boat Falls<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Winch motor + Gear Oil level<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) General appearance (Rust etc)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) General Lubrication<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Last wire renewal date<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Embarkation Ladder(S)
-
Ques 1) Canvas Cover<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Shackle Condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Rope condition<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Steps Condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Free Fall Lifeboat
-
Ques 1) Operating instructions under emcy lighting<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Exterior condition (Specially under resting pads)<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Markings - Name / POR / No. of Pers / dimensions etc<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Release Mechanism<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Grabline condition<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Propeller Condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Rudder Condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Window Glass condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) RR Tapes condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) Door hinge and locking condition<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) General cleanliness<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 12) Seat Condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 13) Safety belt (incl. hooks) condition
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 14) Operating instructions (Engine and onload/offload release)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 15) Hook release correctly reset<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 16) Compass and its light condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 17) Searchlight condition<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 18) Internal & Canopy Light working<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 19) Test engine on both sources<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 20) Bilge pump operation<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 21) Bilges clean and dry<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 22) Rudder operation (Incl. emcy ops)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 23) Fire extinguisher<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 24) Ration / Pyrotech / First aid kit etc expiry dates<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
FF L/B Davit
-
Ques 1) Foundation condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Limit Switches<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Condition of Hyd Cylinder ; Hyd Lines & Operating levers (Hyd Leaks)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Harbour pins<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Sheaves<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Floating blocks<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Wire condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Winch motor + Gear Oil level<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) General appearance (Rust etc)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) General Lubrication<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
Rescue Boat/Fast RB
-
Ques 1) Operating instructions under emcy lighting<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Exterior condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Markings - Name / POR / No. of Pers / dimensions etc<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Atlas hook condition <br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Wires condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) RB, Equipment<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Boat Lashings & resting block condition<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Condition of canvas cover<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
L/B Davit (P)
-
Ques 1) Foundation condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Limit Switches<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Davit winch + Manual operating lever<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Harbour pins<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Sheaves<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Floating blocks<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Boat Falls<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Winch motor + Gear Oil level<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) General appearance (Rust etc)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) General Lubrication<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Last wire renewal date<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
L/B Davit (S)
-
Ques 1) Foundation condition<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 2) Limit Switches<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 3) Davit winch + Manual operating lever<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 4) Harbour pins<br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 5) Sheaves<br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 6) Floating blocks<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 7) Boat Falls<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 8) Winch motor + Gear Oil level<br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 9) General appearance (Rust etc)<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 10) General Lubrication<br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date
-
Ques 11) Last wire renewal date<br><br><br><br><br><br>
-
Details (if any)
-
Image
-
Action Required
-
Due Date