INSPECTION
-
Is the bitumen hose attached to the fixed camlock attachements on the crewcab/truck or are the endcaps fitted?
-
20 mm holes drilled in all endcaps and whip checks fitted on bitumen transfer pipes and caps painted red
-
Has the bitumen hose been tested and certified in the last 12 months by the supplier?
-
Is the outer stainless steel sheath of the bitume hose in good condition (no holes, worn or frayed areas)?
-
Are the end caps fitted with whip checks and are they in good condition?
-
Does the bitumen hose have tags fitted with date of pressure test?
-
Gate valve installed on Wirtgens, Y-Valve operating properly
-
Pressure/Vacuum gauge installed on all Y-Valves used in bitumen application
-
Operators check and purge the system by opening the Y-Valve
-
Daily Job Sheet to include instances of bitumen contamination and to record vacuum or pressure reading from installed gauges
-
Check additional water extinguishers installed on all Wirtgens and large first aid stickers clearly visible on the extinguisher
-
Check that operators tuck balaclava into overalls
-
Check that burns kits are available and well stocked in each Wirtgen crew vehicle
-
Check that scheduled emergency drills have been carried out for all crews