Title Page

  • Inspector:

  • Supervisor:

  • Company:

  • Location:
  • Date:

INSPECTION

  • Is the bitumen hose attached to the fixed camlock attachements on the crewcab/truck or are the endcaps fitted?

  • 20 mm holes drilled in all endcaps and whip checks fitted on bitumen transfer pipes and caps painted red

  • Has the bitumen hose been tested and certified in the last 12 months by the supplier?

  • Is the outer stainless steel sheath of the bitume hose in good condition (no holes, worn or frayed areas)?

  • Are the end caps fitted with whip checks and are they in good condition?

  • Does the bitumen hose have tags fitted with date of pressure test?

  • Gate valve installed on Wirtgens, Y-Valve operating properly

  • Pressure/Vacuum gauge installed on all Y-Valves used in bitumen application

  • Operators check and purge the system by opening the Y-Valve

  • Daily Job Sheet to include instances of bitumen contamination and to record vacuum or pressure reading from installed gauges

  • Check additional water extinguishers installed on all Wirtgens and large first aid stickers clearly visible on the extinguisher

  • Check that operators tuck balaclava into overalls

  • Check that burns kits are available and well stocked in each Wirtgen crew vehicle

  • Check that scheduled emergency drills have been carried out for all crews

Inspection Team

  • Signature:

  • Signature:

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.