Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Firezone Checklist
-
FRAMING BUILD AS PER NCC FRAMING REQUIREMENTS (AS1664 / AS4600)
-
FIRST PANEL HAS SHIPLAP REMOVED AT SLAB CONNECTION
-
4 HOUR FIRE RATED SEALANT TO SEAL ALL GAPS BETWEEN SLAB AND FIRST PANEL
-
PANELS INSTALLED IN A HORIZONTAL / VERTICAL PATTERN - FIRST PANEL HORIZONTAL
-
HAS THE WALL AND ROOF TERMINATION POINTS HAD THE SHIPLAP REMOVED FORM THE PANEL
-
DISTANCE BETWEEN FIREZONE PANEL AND FRAMING IS BETWEEN 20-40MM ON BOTH SIDES OF WALL.
-
FIREZONE BRACKETS CONNECTED TO BOTTOM & TOP PLATE AT MAX. OF 450MM ALL LEVELS - BOTH SIDES
-
INTERMEDIATE BRACKETS (WHERE REQUIRED) ARE INSTALLED
-
ALL SHIPLAPS HAVE 4 HOUR FIRE RATED SEALANT IN THEM
-
ALL SHIPLAPS HAVE BEEN SECURED WITH MIN. OF SS 8GX25MM SCREWS AT A MAXIMUM 300MM SPACING
-
NO DAMAGES ON ANY PANELS AND WALL IS FULL PANEL THICKNESS THROUGHOUT, OR REPAIRED AS PER INSTALL GUIDE
-
NO PENETRATIONS IN THE WALL EXCEPT APPROVED PENETRATIONS BY CERTIFIED BODIES.
Comments / Actions
-
Comments
-
Photos
Sign off
-
Supervisor Signature
-
Date and Time