Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Firezone Checklist

  • FRAMING BUILD AS PER NCC FRAMING REQUIREMENTS (AS1664 / AS4600)

  • FIRST PANEL HAS SHIPLAP REMOVED AT SLAB CONNECTION

  • 4 HOUR FIRE RATED SEALANT TO SEAL ALL GAPS BETWEEN SLAB AND FIRST PANEL

  • PANELS INSTALLED IN A HORIZONTAL / VERTICAL PATTERN - FIRST PANEL HORIZONTAL

  • HAS THE WALL AND ROOF TERMINATION POINTS HAD THE SHIPLAP REMOVED FORM THE PANEL

  • DISTANCE BETWEEN FIREZONE PANEL AND FRAMING IS BETWEEN 20-40MM ON BOTH SIDES OF WALL.

  • FIREZONE BRACKETS CONNECTED TO BOTTOM & TOP PLATE AT MAX. OF 450MM ALL LEVELS - BOTH SIDES

  • INTERMEDIATE BRACKETS (WHERE REQUIRED) ARE INSTALLED

  • ALL SHIPLAPS HAVE 4 HOUR FIRE RATED SEALANT IN THEM

  • ALL SHIPLAPS HAVE BEEN SECURED WITH MIN. OF SS 8GX25MM SCREWS AT A MAXIMUM 300MM SPACING

  • NO DAMAGES ON ANY PANELS AND WALL IS FULL PANEL THICKNESS THROUGHOUT, OR REPAIRED AS PER INSTALL GUIDE

  • NO PENETRATIONS IN THE WALL EXCEPT APPROVED PENETRATIONS BY CERTIFIED BODIES.

Comments / Actions

  • Comments

  • Photos

Sign off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.