Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

  • Offset of retaining wall from boundary as per TP drawings

  • Size of Steel post used as per Engineering drawing and spacing as per RW wall heights

  • Steel post aligned and straight

  • Sleeper size used as per Engineering drawing

  • Sleeper finish and colour as per C&M

  • Steel post trimmed below the sleeper finish level

  • Steel post and sleepers free from concrete

  • Bottom sleeper installed 100mm below the landscape finish level (site cut level)

  • Sleepers aligned horizontally

  • One sleeper installed above the plinth board of boundary fence

  • One sleeper installed below the landscape finish level

  • Moisture Barrier (200 mm Um Plastic Sheeting) installed behind the sleepers

  • AG pipe used as per engineering drawing

  • AG pipe installed with enough slope toward the drain point (No sag) and Agi pipe below the round finish level

  • Granular material used for the back filling

  • AG pipe connected to the storm water pit

  • Stormwater risers are provided at downpipe locations

  • Is the site clean

  • Are there any internal or external damages to the property

  • Upload Images to folder

Comments / Actions

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.