Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Are the fixings used to the latest Rev fixing schedule?

  • Is a 2-5mm gap maintained between boards?

  • Is 12-15mm edge distance for the screws maintained around the perimeter of the board?

  • Are fixings vertically no bigger distances apart than 300mm and horizontally no wider apart than 600mm?

  • Are fixings in the corner 50mm in from the bottom and top edge of the board as shown in 'Detail A' on the installation guide?

  • Has fire rated sealant and daffa tape been applied to all the edges of the sheathing board?

  • Any additional holes in the sheathing board sealed?

Sign off

  • A2O representative sign off

  • ISG representative sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.